My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-06_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2008-08-06_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:15 PM
Creation date
8/11/2008 9:34:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
8/6/2008
Doc Name
Midterm Review Reclamation Cost Estimate
From
DRMS
To
Seneca Coal Company
Type & Sequence
MT5
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Haulinst Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : _ <br />Material weight : 1,600 pounds/LCY Struck volume : 24.00 <br />--- <br />~ - LCY <br />Material description Heaped volume :- 34.00 LCY <br />Coal 'Bituminous, Raw <br />` Average volume : 29.00 LCY <br />Rated payload 75,000 pounds Adjusted capacity : 29.00 LCY <br />Payload capacity : 4688 LCY ?•• hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site attitude ft) : 8,000 <br /> Scraper Push dozer Source <br />Scraper loading time 1.00 minutes Altitude adj.0.980 NA (Gat HB) <br />Maneuver and spread time : 0.60 <br />_ .. --_ minutes Job efficiency :; 0.830 <br />_.._. NA <br />.......? _ .w (Gat HB) <br />_._._._.._ <br />' load time per scraper pair on push-pull models Net correction : 0.813 NA <br />Travel time : <br />Road condition description :Firm, smooth, rolling, didM. surfaced., watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) j Travel time (min.)- <br />1 3,000 500 3.00 8.00 1131 l 2.69 <br /> - <br />-- - <br />Return route : <br />Haul time : 2.69. minutes <br />" travel tirne for each segment is adjusted for acceleration/deceleration Return time : 1,05 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 5.34 minutes <br />Unadjusted unit productionthour : 651.64 LCY/hour Adjusted for job conditions : 530.04 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : <br />--- 530.04 <br />------._ ........................... LCYthour <br />...._. <br />Adjusted multiple scraper team (fleet) hourly production : 1,060.09 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 2 Team(s) Total job time : 9.43 Hours <br />Unit cost : $1.359 /LCY Total job cost. $13,592
The URL can be used to link to this page
Your browser does not support the video tag.