Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 009 - State : Colorado Permitrjob# : C-1982-057 <br />Date : 08/05!2008 County: Routt - Abbreviation : none <br />User : JRS Site : Seneca li-W Filename : 0057-009 <br />Agency or organization name : Colorado Division of Reclamation, Mining And Safety <br />- <br />---•- - -- - - - ------- .-._^- --- ?...._-.--- <br />-- R-eview <br />Permit or other job action :2008 Midterm-- <br />Task description : Doze South Wadge Pit Highwall - Partially Back ill Pit <br />HOURLY EQUIPMENT COST <br />Basic machine. Cat D1 1R - 11U (2005) - Horsepower : 850 <br />_ <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> " Utilization % ----..___..--__--- <br />Cost Breakdown : Ownership cost/hour : $174.40 NA <br /> Operating costihour : $225.78 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $432.96 Total fleet cost/hour : $1,731.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : - 553,400 LCY factor : NA volume : 553,400 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance: 100 feet <br />-- Material consistency : 1,20 (Cat HB) <br />Unadjusted hourly production : 2,870.3 LCY/hr Dozing method : 1.10 (50% s!) <br /> Visibility: 1,00 (avg.) <br /> <br />Material consistency description <br />: _. <br />Job efficiency : ._..._._.._.._._....___-.._.. <br />0.83 -t-.--._..__..._...._._. <br />(1sh?tt/day) <br />Loose stockpile - -- <br />--... _ .... Spoil pile : <br />- 0.90 <br />-- ----------- <br />._._.. (ssd-fc) <br /> <br />Push gradient : <br />. <br />1.22 _ <br />._..,_ (Gat HB - <br />) <br /> <br />Average push gradient : <br />10_,00 ?b (ne9)-.-. <br />--- ..._.: <br />Attitude : _..._ -.... <br />0,93 - <br />i <br />H$) <br />(Gat <br /> <br />Average site attitude <br />: <br />8,000 feet <br />_ <br />Material weight : <br />_ <br />_ .. -- . ,. <br />0.90 <br />... <br />-- _ .. <br />-- .--- <br />(Cat HB) <br /> j Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.76 <br />Weight description : <br />Sandstone Adjusted unit production : 2181.17 LCY/hr <br /> Adjusted fleet production : 8,724.69 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time 63.43 Hours <br />Unit cost : $0.198 /LCY Total job cost : $109,849