My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-11_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2008-08-11_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 8:07:53 AM
Creation date
8/11/2008 9:25:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
8/11/2008
Doc Name Note
Water Monitoring - Groundwater and Surface Water
From
Battle Mountain Resources, Inc
To
DRMS
Type & Sequence
TR32
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I\ Jl ?, <br /> <br /> <br /> <br /> <br />Xj <br />BATTLE MOUNTAIN RESOURCES, INC. <br />August 06, 2008 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />July 2008 Monthly Report <br />Dear Mr. Sorensen: <br /> <br />AUG 112008 ? <br />Divnion cr -?eG!amaticn, L59 <br />k1laing and Sa,IeV <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of July 2008. <br />?Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) Plan. <br />Vacuum oil the tailing lysimeters was verified on July 31' , no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit monitoring wells on July 31st. July tailing impoundment piezometer measurements <br />identified these installations were either dry or contained less than 12 inches of water as <br />illustrated in Table 2. Tables 1 and 2 below identify the depth to water measurements collected <br />for each of the site monitoring wells, piezometers and lysimeters as required by the terms and <br />conditions of the TR-32 QAIQC plan. <br />The leak detection system was measured on July 31 s<. A total of 680 gallons of water was <br />excavated from the leak detection system yielding a monthly average of 21.93 gpad. The tailings <br />pond under-drain measured 34 gpm. <br />During July the West Pit water treatment plant operated efficiently discharging a total of <br />9,751,000 gallons (29.93 acre-feet) of water to Rito Seco Creek and a total of 521,700 gallons <br />(1.60 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />P.O. Box 310 • San Luis, Colorado 81152-0310 • (719) 379-0798 • Fax (719) 379-0713
The URL can be used to link to this page
Your browser does not support the video tag.