My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-06_PERMIT FILE - M2008006
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008006
>
2008-08-06_PERMIT FILE - M2008006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:14 PM
Creation date
8/8/2008 1:09:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008006
IBM Index Class Name
PERMIT FILE
Doc Date
8/6/2008
Doc Name
Second Adequacy Review
From
DRMS
To
Connell Resources, Inc.
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DRMS <br />Permit or other job action : New Permit Application <br />Task description : Grade remaining area around reservoir <br />........:..::..:.;...:: <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Source of estimated volume :Applegate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 300 feet <br />Unadjusted hourly production : 291.4 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % () <br />Average site altitude : 6,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description : <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility: 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.60 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.34 <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/da) <br />(fnd-so <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />Earth - Dry packed Adjusted unit production : 98.13 LCY/hr <br />Adjusted fleet production : 98.13 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 32.88 Hours <br />Unit cost : $1.702 /LCY Total job cost : $5,492
The URL can be used to link to this page
Your browser does not support the video tag.