Laserfiche WebLink
:x: 1 <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />-Water Tanker, 5,000 Gal. $78.58 1 $78.58 $78.58 <br />Subtotals :1 $78.58 1 $78.58 <br /> <br />EQUIPMENT HAUL DISTANCE and TIME ............... .... ...........::::...::.:::.::.:::::::::::::: ::::::,:: <br /> Nearest major city or town within project area region : Windsor <br />Transportation Cycle Time: Non- Total one-wa <br />travel dista 2 <br />0 <br /> y <br />nce : . <br />miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.05 0.05 Total non-roadable mob/demob cost $2,114.26 <br />Return time (hours) = 0.05 0.05 * two round hips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $7.86 <br />Unloading time (hours) = 0.50 NA '• one round trip, no haul rig <br />Subtotals = 1.10 0.10 <br /> <br />JOB TIM; ; ...................................... <br /> <br /> <br />E AND COST <br />:..:::::.:: <br />.......... <br />............................. <br />: :.:::::::::::...:::.::: <br />............:.:.........: <br />......................... _ . .........................................._.................................................. <br /> <br /> <br />Total job time : <br />..... ................... ..... <br />........ ......................... <br />2.20 hours <br /> Total job cost : $2.122