My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-06_PERMIT FILE - M2008006
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008006
>
2008-08-06_PERMIT FILE - M2008006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:14 PM
Creation date
8/8/2008 1:09:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008006
IBM Index Class Name
PERMIT FILE
Doc Date
8/6/2008
Doc Name
Second Adequacy Review
From
DRMS
To
Connell Resources, Inc.
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
............. <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Basis : <br />Bowl (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 15.70 LCY <br />Material description : Heaped volume : 21.00 LCY <br />Earth - Dry packed Average volume : 18.35 LCY <br />Rated payload : 48,000 pounds Adjusted capacity : 18.35 LCY *** <br />Payload capacity : 18.82 LCY '*• hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 6,000 <br /> Scraper Push dozer Source <br />Scraper loading time 1.50 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 600 0.00 5.00 5.00 2218 0.45 <br />2 300 0.00 5.00 5.00 2218 0.14 <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.58 minutes <br />Return route <br />1 300 0.00 5.00 5.00 2814 0.26 <br />2 600 0.00 5.00 5.00 2814 0.21 <br /> <br /> <br /> <br /> <br /> <br /> <br />•' travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.47 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.15 minutes <br />Unadjusted unit production/hour : 349.61 LCY/hour *** Adjusted for job conditions : 290.18 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 1 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 290.18 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 290.18 LCY/hour
The URL can be used to link to this page
Your browser does not support the video tag.