Laserfiche WebLink
V. Status of Problem Resolution <br /> The following items .concern problems identified at previous inspections. <br /> Problems are classified into two categories. These are: (1 ) problems <br /> resolved;. and (2) operator delinquent. The date that the problem is <br /> resolved or the date that the operator is deemed delinquent is to be <br /> clearly stated. <br /> Problem Resolved <br /> 017-83-1. Coal has been cleaned from the undisturbed area below the mine <br /> No. 2 coal stockpile. A buffer strip has been established and a berm <br /> constructed. <br /> 017-83-3. The bathhouse pond emergency spillway has been sealed. <br /> 017-83-4. Sediment has been removed from the MK pond. <br /> 017-83-6. Sediment ponds below the refuse pile have been cleaned. <br /> Additionally, a flocculent system is at the discharge of the first pond <br /> to be utilized if necessary. <br /> Resolution in Progress <br /> 017-83-5. The bus garage ponds were not discharging at the time of the <br /> inspection. The ponds will be cleaned within the next two weeks which is <br /> within the time frame for compliance. A flocculent system has been set <br /> up to be utilized if necessary. <br /> i <br /> i <br />