Laserfiche WebLink
III. Comments — Compliance <br /> Below are particular issues with regard to any of the compliance items. <br /> Enforcement actions resulting from failure to comply with the Act, Rules <br /> and Regulations, and the permit also are identified below. <br /> 1.. Topsoil temporarily stored below the rock tunnel pile has been moved <br /> to a permanent location. <br /> 2. The bench at the No. 1 mine appears stable and no mud flows have <br /> occurred this spring. <br /> 3. The past slump above the rock tunnel face up area has been <br /> stabilized. There is no evidence. of further slumping this spring. <br /> 4. Revegetation along the methane gas line is excellent. <br /> 5. All roadside ditches leading to the mines are in the process of being <br /> cleaned. Ditches leading to the No. 3 & No. 5 mine were being cleaned at <br /> the time of the inspection. <br />