Laserfiche WebLink
3 (Form 2- Public) <br />C. LOCATION MAP: Attach a USGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br />site(s). <br />D. Are prospect sites (e.g., drill holes, trench locations, etc... ) staked on the ground`? Yes No <br />E. Specify the Land Management Agency, Address and Telephone Number: <br />__3L <br />G?W,? Co X150 b <br />9:2 - .2 i'J-3000 <br />F. The prospector is required to document that the NOI has been sent to the .BLM or the USFS. Processing of the NOI will <br />not begin until the prospector has submitted-evidence acceptable to the Division that the NOI was sent to the 13LM or <br />USFS. Check one:. <br />Evidence of notification is attached to. this NOi for BLM IAnd <br />Evidence of notification is attached to this NOI for USFS Land. <br />Other proof of notice is attached to this NOI <br />II. MAPS & DRAWINGS <br />Accurate topographic base map showing the location of the proposed project. must be. submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle; or similar map of adequate scale that; <br />I`., identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes, <br />mud pits, excavations, trenches, adits; shafts, tunnels, rock dumps, stockpiles, impoundments an <br />d prospecting roads, and <br />2. includes sufficient detail to identify and Ideate known prospecting features and facilities that may be affected and those that <br />are not anticipated to be affected This includes the location of all drill holes, mud pits, excavations; trenches, adits, shafts, <br />tunnels, rock dumps, stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (including <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NOI <br />submittal. <br />III PROJECT DESCRIPTION J 1 <br />1. Mineral(s) and/or Resource(s) being Investigated: <br />fc <br />2. Estimated dates of commencement and completion: <br />Commencement: 7 tiv? ws )z n <br />Completion: r'? ?0 0.$ <br />3. Amount of material to be. extracted, moved or proposed to be moved: <br />4. Identify the type or method of prospecting proposed and quantity (place an "X") <br />Cuts Pits Trenches <br />Shafts Tunnels Adits Declines <br />_ Air Drilling Fluid Drilling ,---- Drilling & Blasting <br />?oss61c