Laserfiche WebLink
c. Cross drains should be constructed with an outslope grade of 3 to 5 percent or equal <br />to the existing out-slope grade. <br />b.. <br />c. Forestry - N/A <br />d. Recreation - N/A <br />e. Geotechnical - N/A