My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
- 7/17/2008, 11:32:09 AM-JWD
DRMS
>
Public
>
- 7/17/2008, 11:32:09 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 7:44:29 AM
Creation date
7/17/2008 2:14:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
Permit File
Doc Date
7/1/2008
Doc Name
New NOI- Non. Conf.
From
AMSO
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE INFORMATION ON THIS PAGE DOES NOT NEED TO BE HELD CONFIDENTIAL <br /> Exhibit C-AMSO,LLC Notice of Intent Supplemental Information <br /> • BG "B" Groove Monitor Well (See Figure C.9 in this section) <br /> • Drill 12 1/4"hole a minimum of 20 feet or until at least 5 feet of competent <br /> bedrock is encountered.(Air or Air/Foam) <br /> • Run 9 5/8", 36#,J-55 Surface Casing. <br /> • Cement with"Neat Cement"to surface. <br /> • Rig up diverter and wait on cement a minimum of 4 hours. <br /> • Drill out thru the surface casing with 7 7/8"diameter PDC bit using air foam.. <br /> Advance drill hole to±1020 feet and circulate a minimum of 30 minutes. Short <br /> trip any tight spots. <br /> Run 5 '/2", 15.5#,J-55 casing with a grout float shoe. Mix and pump Type I or II <br /> Portland cement with 2%bentonite with 10%excess. If cement does not circulate <br /> to surface,bentonite chips will be poured down the backside until it reaches the <br /> surface. In either case a seal must be established around the 5 %2"casing at <br /> • surface. <br /> • Wait on cement for a minimum of 12 hours. <br /> • Trip in the hole with nominal 4 5/8"drill bit and drill float shoe and cement. <br /> • Continue drilling to a TD of 1060 feet. <br /> Circulate the hole with air/foam for 30 minutes then with air until formation water <br /> is observed. <br /> • Rig down and demob. <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.