My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
- 7/17/2008, 11:32:09 AM-JWD
DRMS
>
Public
>
- 7/17/2008, 11:32:09 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 7:44:29 AM
Creation date
7/17/2008 2:14:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
Permit File
Doc Date
7/1/2008
Doc Name
New NOI- Non. Conf.
From
AMSO
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE INFORMATION ON THIS PAGE DOES NOT NEED TO BE HELD CONFIDENTIAL <br /> Exhibit C-AMSO,LLC Notice of Intent Supplemental Information <br /> • TM-1 through TM-4 (See Figure C.5 in this section) <br /> (All TM wells will be drilled following the same methods) <br /> Tomography and Illite Zone Hydrology Test Hole <br /> • Drill a 19"diameter hole a minimum of 20 feet with at least 5 feet into competent <br /> bedrock. Historically, surface casing holes have been 40 to 60 feet deep. (Air or <br /> Air/Foam) <br /> • Run 16",75#,J-55 Surface Casing. <br /> • Cement with"Neat Cement"to surface. <br /> • Rig up diverter and wait on cement a minimum of 4 hours. <br /> • Drill out through the surface casing with 14-3/4 diameter bit using air foam. <br /> Advance the drill hole to±1940 feet,circulate until clean,and condition for <br /> geophysical logging. Mud drilling may be utilized to control water flows. <br /> • Trip out of the hole and run geophysical logging suite.(TM-1 only) <br /> • Run 10-3/4",40.5#J-55 casing with a guide/float shoe to—1932 feet(top of <br /> Illite). <br /> • Mix and pump a Type I or II Portland Cement with 2%bentonite to surface. <br /> (service company) <br /> • Wait on cement 12 hours. <br /> • Trip into the hole with a nominal 9-7/8"bit and drill from 1940 to 2300' (TD). <br /> • Circulate the hole clean and trip out of the hole. <br /> • Run geophysical logs from TD to the bottom of the 10-3/4"casing.(Hole TM-1 <br /> only) <br /> • Move to TM-2,drill and complete identical to TM-1. Repeat with TM-3 and TM- <br /> 4. No geophysical logging will be done on TM-2 through TM-4 <br /> • Perform hydrologic testing on the Illite test zone. <br /> • After hydrologic testing is completed,rig back up and Run 4 '/z",DHC 250 <br /> fiberglass casing from TD to surface on TM-1 through TM-4. Cement:to—1840 ft. <br /> (100 feet into the 10-3/4"casing) <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.