My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
- 7/17/2008, 11:32:09 AM-JWD
DRMS
>
Public
>
- 7/17/2008, 11:32:09 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 7:44:29 AM
Creation date
7/17/2008 2:14:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
Permit File
Doc Date
7/1/2008
Doc Name
New NOI- Non. Conf.
From
AMSO
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE INFORMATION ON THIS PAGE DOES NOT NEED TO BE HELD CONFIDENTIAL <br /> Exhibit C-AMSO,LLC Notice of Intent Supplemental Information <br /> • DETAILED DRILLING AND COMPLETION PLAN <br /> DRILL PAD TP(TEST PAD) <br /> CH-01 (See Figure CA in this section) <br /> Continuous Core and Hydrology Test Hole <br /> • Drill a 9 7/8"diameter hole a minimum of 20 feet with at least 5 feet into <br /> competent bedrock. Historically, surface casing holes have been 40 to 60 feet <br /> deep. (Air or Air/Foam) <br /> • Run 7 5/8" Surface Casing. <br /> • Cement with"Neat Cement"to surface. <br /> • Rig.up diverter and wait on cement a minimum of 4 hours. <br /> • Drill out thru the surface casing with 6 1/4"diameter PDC bit using air foam. <br /> Advance the drill hole to±600 feet. <br /> • Run 4 1/2",J 55 casing to bottom of the hole. This will be temporary casing and <br /> will be recovered after coring. <br /> • • Set up core drill <br /> • Core with an HQ3 core set up from—600 feet to—2500 feet. Use a 10 ft. core <br /> barrel and mud circulation. <br /> • At Total Depth(-2500),circulate the hole clean and trip out of the hone. <br /> • Demob the core rig and rig up rotary drill. <br /> • Recover 4 '/2"easing, <br /> • Trip in the hole with a 6 '/4"PDC bit and open the hole to 2500' <br /> • Circulate the hole clean and trip out of the hole <br /> • Run geophysical logs from TD to the bottom of the 7 5/8"casing. <br /> • Set any required instrumentation and temporary packers. <br /> • Rig down and de-mob <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.