Laserfiche WebLink
THE INFORMATION ON THIS PAGE DOES NOT NEED TO BE HELD CONFIDENTIAL <br /> 3 <br /> C. LOCATION MAP: Attach a USGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br /> site(s). please see attached Exhibit A.1 "Site Location-AMSO Test Site" <br /> D. Are prospect sites(e.g.,drill holes,trench locations,etc...)staked on the ground? Yes No X <br /> E. Specify the Land Management Agency, Address and Telephone Number: <br /> U.S.Bureau of Land Management-White River Field Office <br /> 220 East Market Street <br /> Meeker,CO 81641 <br /> (970)878-3800 <br /> F. The prospector is required to document that the NOI has been sent to the BLM or the USFS. Processing of the NOI will <br /> not begin until the prospector has submitted evidence acceptable to the Division that the NO[ was sent to the BLM or <br /> USFS. Check one: <br /> X Evidence of notification is attached to this NO] for BLM Land <br /> - � Evidence of notification is attached to this NOI for USFS Land. <br /> Other proof of notice is attached to this NOI <br /> Ii. MAPS & DRAWINGS <br /> Accurate topographic base map showing the Iocation of the proposed project must be submitted with this notice. The prospector <br /> may submit a U.S.G.S.7.5 minute quadrangle,or similar map of adequate scale that: <br /> 1, identifies the proposed prospecting site(s)or activity areas involving surface disturbance. Activity areas include all drill holes, <br /> mud pits,excavations,trenches,adits,shafts,tunnels,rock dumps,stockpiles, impoundments and prospecting roads,and <br /> 2. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br /> are not anticipated to be affected. This includes the location of all drill holes,mud pits,excavations,trenches,adits,shafts, <br /> tunnels,rock dumps,stockpiles, impoundments and prospecting roads. Color photographs,adequately labeled(including <br /> date,orientation and location),of the prospecting site may be used to fulfill this requirement if included with the NOI <br /> submittal. <br /> Please see attached ExhibitA.2"Proposed Site Layout-Topographic",Exhibit A.3"Proposed Site Layout-Aerial",and Exhibit B"Photographs" <br /> III PROJECT DESCRIPTION <br /> 1_ Mineral(s)and/or Resource(s)being Investigated: Oil Shale <br /> 2. Estimated dates of commencement and completion: <br /> Commencement: 08-16-2008(Phase 1) <br /> Completion: 12-31-2009(Phase I) <br /> 3. Amount of material to be extracted,moved or proposed to be moved:_ 100 ft3 <br /> 4. Identify the type or method of prospecting proposed and quantity(place an"X") <br /> Cuts Pits Trenches <br /> 0 Shafts Tunnels Adits Declines <br /> X Air Drilling X Fluid Drilling ,Drilling& Blasting <br />