Laserfiche WebLink
Table 2 - Disturbance Breakdown <br />Feature T e Feature ID II Length Feet Area Feet Area Acres <br />Access 12' New Access to AM-08-003 160 1920 0.044077135 <br />Access 12' Incidental & Access Buffer 2000 24000 0.550964187 <br />Pad AM-08-001 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-003 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-004 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-005 20'x40' and 10' X 10' it 900 0.020661157 <br />Pad AM-08-006 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-007 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-008 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-009 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-010 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-011 20'x40' and 10'X 10' pit 900 0.020661157 <br />Pad AM-08-012 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-013 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-014 20'x40' and 10'X 10' it 900 0.020661157 <br />Pad AM-08-015 20'x40' and 10'X 10' it 900 0.020661157 <br /> Total Approx Acreage . -> 0.884297521 <br />Surface disturbance from earthwork is only proposed at the drill sites and only if <br />necessary. For the purposes of disturbance estimation, it was assumed that each drill <br />site would be 20-feet by 40-feet and that all fourteen of the drill sites would need blading <br />and grading. It is further assumed that cut and fill slopes would not create additional <br />disturbance on each side of each pad. Assuming fourteen sites need minor leveling <br />and construction of the fourteen outboard 10'X 10' pits 0.29 acres of disturbance may <br />result from construction of drill sites and associated pits. <br />No impacts or disturbance from pedestrian point placement and recording is anticipated, <br />as again, such pedestrian-based activity would meet the criteria for classification as <br />"casual use." <br />Data Acquisition <br />Recording equipment, supplies and possibly core would be transported to and from the <br />field by truck or backhoe using existing roads and proposed travel routes. Sufficient <br />equipment to drill holes and minimize transport use would be placed on the drill pad and <br />carried from hole to hole with the drilling rig and supply transports. <br />Approximately 3 crewmembers would conduct daily operations for 12 to 14 hours per <br />day. Crewmembers would be organized into field groups of 2 to 4 personnel; groups <br />would operate at intervals throughout the project area. Crewmembers would carpool <br />daily to the project area in the morning and return to surrounding cities/towns in the <br />evening. <br />Demobilization <br />The demobilization task would proceed concurrently with data acquisition. All stakes, <br />flagging, and other trash would be gathered daily as the field groups and crew members <br />complete data-acquisition portions of the project. The refuse would be collected at