Laserfiche WebLink
3 <br />C. LOCATION MAP: Attach a USGS 7:5 minute quad, or similar map of adequate scale, which. locates the prospecting <br />site(s). <br />D. Are prospect sites (e.g., drill holes, trench locations, etc...) staked on the ground? Yes No <br />E. 'Specify the Land Management Agency, Address and Telephone Number <br />F. The prospector is. required to document that the. NOI .has been sent to the BLM or the USFS: Processing of the NOI will <br />not begin until the prospector has submitted evidence acceptable to the Division that the NO[ was sent to the BLM or <br />USFS. Check one: <br />Evidence of notification is attached to this NO] for BLM Land. <br />Evidence of notification is attached to this NOI for USFS Land. <br />Other proof of notice is attached to this NOi <br />II. MAPS & DRAWINGS <br />Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br />may submit a.U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that: <br />1. identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes, <br />mud pits, excavations, trenches, adits, shafts, tunnels,.rock dumps, stockpiles, impoundments and prospecting roads, and <br />2. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those. that <br />are not anticipated to be affected. This includes the location of all drill holes, mud pits, excavations, trenches, adits, shafts, <br />tunnels, rock dumps, stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (inching <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NOI <br />submittal. <br />III PROJECT DESCRIPTION <br />L Mineral(s) and/or Resource(s) being investigated: Confiden ial <br />2. Estimated dates of commencement and completion; <br />Commencement: September 2008 , <br />Completion: September 2010 , <br />3. Amount of material to be.extracted, moved or proposed to be moved: ConfNieritial <br />4. Identify the type or.methad.of prospecting proposed and quantity (place as "X") <br />Cuts Pits Trenches <br />Shafts Tunnels Adits Declines <br />Air Drilling Fluid Drilling Drilling &. Blasting