Laserfiche WebLink
(Page 2) <br />MINE ID # OR PROSPECTING ID #: P-2008-025 <br />INSPECTION DATE: 6-4-08 <br />INSPECTOR'S INITIALS GRM <br />OBSERVATIONS <br />This inspection was conducted as part of the normal program established by the Colorado Division of Reclamation, <br />Mining and Safety for the submission of Notice of Intent. The Uravan-Beck Project is a series of Notices located in <br />western Montrose County. Sites straddle the Delores River on high mesas above the canyon rim. This inspection <br />was a joint site visit with Robert Ernst and BLM personnel form the Uncompahgre Field Office. Dick Klatt from <br />Yellowcake Mining and Marit Sawyer from JBR Consultants accompanied DRMS and BLM personnel on site. <br />Site P-2 is typical of all the proposed activities. A drill pad area will be established to do a picket fence drill pattern <br />on pre-existing disturbance as much as possible. The drill rig is an air rotary / hammer style rig mounted on a truck. <br />The initial Notice had the drill pads being cleared of topsoil. Due to the type of drill this should not be necessary. <br />The truck can move overland with little to no disturbance and the hole site should require little prep work as well. <br />The only concern is multiple pick-ups driving in and out of a site as drilling progresses. The drill operators should <br />be cautioned to limit traffic and use the same ingress and egress to prevent large scale compaction of the site if the <br />holes are off existing roadways. <br />P-2 will use existing roads which have very little to no vegetation. The roads are from pre-law drilling activities and <br />are defined currently by clear two tract roads. Some minor repairs to the access road will be required but a majority <br />of the road is in good condition. Where necessary the Notice holder should place water bars across key points to <br />reduce any erosion in the areas that are repaired. Some minor tree trimming maybe necessary but major clearing <br />appears not to be necessary. The drill hole pattern will stay out of any drainages and at this site there are no <br />waterways noted of importance. <br />Overall the project for this site is well presented in the Notice and no issues are noted at this time. A reclamation <br />liability estimate will be calculated based on the site visit and Notice information. <br />Responses to this inspection report should be directed to Russ Means at the Division of Reclamation, Mining and <br />Safety, Grand Junction Field Office, 101 South 3rd Street, Room 301, Grand Junction, Colorado 81501, phone no. <br />970-241-1117. <br />I & E Contact Address <br />NAME: Dick Klatt <br />OPERATOR: Yellowcake Mining Inc_ <br />STREET: 951 East 8800 South <br />CITY/STATE/ZIP: Sandy, UT 84094-1959 <br />cc: <br />X CE: JBR Consulting <br />X BLM: Uncompahgre Field Office <br />? FS <br />? HW <br />? HMWMD (CH) <br />? WQCD (CH) <br />? OTHER