My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 6/6/2008, 7:56:39 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 6/6/2008, 7:56:39 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:38 PM
Creation date
6/6/2008 8:27:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008023
IBM Index Class Name
PERMIT FILE
Doc Date
6/3/2008
Doc Name
Reclamation liability estimate
From
DRMS
To
BlueRock Energy Corp.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 03-Jun-2008 Permit or job no. P-2008-023 Site :J-Birds Project <br />User : GRM Abbreviation : none State : Colorado <br />Filename <br />P023-000 <br />County :Montrose <br />Agency or organization name: DRMS <br />Permit or job action : Final Reclamation Liability Estimate <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Seal 48 drill holes borehole 1 24.0 $908 <br />02a -Misc. earthwork and repairs loader 1 12.0 _ $623 <br />03a -reveg of 0.49 acres of disturbance revege 1 16.0 _ $790 <br />04a -initial mobilization mobilize 3 6.0 $754 <br />05a -Secondary seeding mobilization mobilize 1 1.5 $48 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 59.5 $3,123 <br />*includes inflation factor adjustment of : NA % TOTAL DIRECT COST * = $3423 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $63 <br />Performance bond : 1.05 % of direct total = $33 <br />Job superintendent : NA NA NA total = _ <br />NA <br />Profit : 10.00 % of direct total = $312 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $408 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) = $3,531 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $177 <br />CONTINGENCY - NA" NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $1,085 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $4,208
The URL can be used to link to this page
Your browser does not support the video tag.