Laserfiche WebLink
6 <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />See Appendix B, Section IV.3 <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />See Appendix B, Section IVA <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule S for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />No pgrtals, adits, drifts, ponds, or excavations will be made. None are <br />located within the drill sites and thus none will be disturbed. <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />Upon completion of drill work, any part of the access trail that was <br />graded or bladed will be reworked to blend with surroundings, and __ __ <br />windrowed soil will be pushed back over the trail. The disturbed area <br />will then be broadcast seeded with the approved seed mix and hand raked <br />to cover the seed.