Laserfiche WebLink
6 <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth; <br />See Appendix B, Section IV.3. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />See Appendix B, Section TV-4 <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />No portals, adits, drifts, or ponds, or excavations <br />_ will be made. None-are located within the drill <br />sites and thus none will be disturbed. <br />6. Describe ho%v roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />TUpon completion of drill workr any part of_the access <br />?- <br />trail that was graded or bladed will <br />blend with surroundings, and windrowed soil will be <br />pushed back over the trail. The disturbed area wil~then <br />be broadcast seeded with the approved seed mix• and <br />raked to cover the seed.