My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 5/28/2008, 1:35:54 PM-MR1
DRMS
>
Public
>
PERMIT FILE - 5/28/2008, 1:35:54 PM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:31 PM
Creation date
5/28/2008 2:58:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008025
IBM Index Class Name
PERMIT FILE
Doc Date
5/21/2008
Doc Name
New NOI
From
Yellowcake MIning, Inc.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URAVAN-BECK PROJECT DRILL SITE P-2 Page 2 of 6 <br />NOTICE OF INTENT TO COMMENCE PROSPECTING <br />APPENDICES To NOI APPLICATION <br />prior to topsoil stripping. The woody material will be stored near the center of drilling activity <br />and hauled to the Montrose County West End Landfill, located two miles west and one mile <br />north of Nucla when the site is reclaimed. <br />No underground workings will be created or disturbed. <br />Section 111.7. D. <br />Twenty drill holes will be situated in 3- to 7-hole fence patterns of close-order (15-25 ft. <br />separation). The sub-parallel fences may be as close as 50 ft. apart, depending on old drill <br />patterns, roads, and topography. All drilling disturbance will be located within the 4.5 acre <br />drill site. <br />Topsoil stockpiles will be constructed along the side of each drill fence for use in <br />reclamation. <br />One access trail, approximately 570 ft. long x 15 ft. wide, will follow an old exploration trail <br />into the 4.5 acre drill site. <br />Section 111. T H. <br />Equipment for Drilling: <br />• Three pick-ups: one for Yellowcake logger, one for geophysical logger, one for <br />driller. <br />• Drill rig. <br />• Plastic water tank will be mounted on one truck (used for mixing bentonite or neat <br />cement for hole plugging and abandonment, and for fire safety). Water will be <br />purchased locally. <br />• Fuel will be carried in approved containers on second pickup. <br />• One truck-mounted drilling rig, 1,000 to 1,500-ft. depth capability, air-rotary and <br />hammer-type drills on board. <br />• One wheeled backhoe with blade and bucket. <br />• One ATV with trailer for reclamation seeding work. <br />• One low-boy trailer to haul the backhoe and ATV close to the site. The trailer will be <br />parked on the Q-13 (Geyser Pass) road at the edge of the drill area to minimize site <br />impacts. <br />Section /1/. 7.1 <br />Soil will be stripped to a 6 in. depth from a 20 ft. diameter area around each drill hole. Total <br />volume of topsoil stored per drill hole will be approximately 7.4 CY. Soil will be stored in one <br />\stockpile for each drill fence, next to the drill holes. Soil will not be stripped from the
The URL can be used to link to this page
Your browser does not support the video tag.