Laserfiche WebLink
URAVAN-BECK PROJECT DRILL SITE P-1 Page 4 of 7 <br />NOTICE OF INTENT TO COMMENCE PROSPECTING <br />APPENDICES To NOI APPLICATION <br />abandonment regulations as described in Chapter 5.4 of the DRMS hard rock regulations. <br />Drill holes will be plugged per DRMS Hard Rock Rule 5.4 Any drill holes that have evidence <br />of artesian flow will be plugged with a neat cement grout or similar material to prevent any <br />flow to the surface. Any hole that encounters an aquifer will be sealed to prevent <br />contamination of this aquifer using high quality sodium bentonite gel specifically designed <br />for use as an abandonment fluid. All dry holes will be backfilled with cuttings, and plugged <br />from 7 to 2 ft. bgs with a cement plug. The final two ft. to the surface will be filled with <br />remaining cuttings or dirt.