Laserfiche WebLink
URAVAN-BECK PROJECT DRILL SITE P-4 <br />NOTICE OF INTENT TO COMMENCE PROSPECTING <br />APPENDICES To NOI APPLICATION <br />APPENDIX C: Financial Surety Information <br />Page 5 of 7 <br />The cost for a third party to reclaim the drill hole site is estimated to be $12,000.00. This <br />assumes that 20 drill hole locations will need to be plugged. Each drill hole will have a 20 ft. <br />x 20 ft. area around it stripped of topsoil. Topsoil will be stored in a pile that is 150 ft. or less <br />from each drill hole, and drill hole cuttings will be stored on the drill pads. Back-up <br />explanations for costs used are included below. <br />TRIlowcake Surety Calculations <br />la <br />Line Task Cost <br /> <br />1 Mobilization/Demobilization from Moab (80 mi) <br /> <br />2 Front End Loader (FEL), with ATV & ATV trailer - <br />i back on flat bed <br />$ 1,420.00 <br />3 Subtotal - Mobilization/Demobilization $ 1,420.00 <br /> <br /> Hourly Costs Total <br />4 Operation Equipment Labor Hours <br />5 Regrade and topsoil drill pads and access trails with <br />FEL, 1 hr/pad, no access trail reclamation needed. 81.81 61.75 20 $ 2,871.20 <br /> <br />6 Broadcast seed using ATV & ATV-mounted <br />broadcast seeder and harrow, one pass. Equipment <br />rental below. <br />61.75 <br />2 <br />$ 123.50 <br />7 Hole plugging, 1.5 hour per hole, 2 workers (includes <br />backfill & plugging) 1 123.5 30 $ 3,705.00 <br />8 Subtotal - Operation $ 6,699.70 <br /> <br /> Cost Number <br />9 Supplies per Unit of Units <br />10 ATV rental, Unit = days of rental 180 1 $ 180.00 <br />11 Grout pump, Units = days of rental 105 3 $ 315.00 <br />12 Neat Cement, 5' plug per hole, Unit = bags 6 13 $ 78.00 <br />13 Seed for 1 acres @ $300/acre, Unit = Ibs of seed 300 1 $ 300.00 <br />14 Water, Unit = gallons 0.0083 5,000 $ 41.50 <br />15 Subtotal - Supplies $ 914.50 <br />16 TOTAL $ 9,034.20 <br />