My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 5/28/2008, 10:12:00 AM-JWD
DRMS
>
Public
>
PERMIT FILE - 5/28/2008, 10:12:00 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:31 PM
Creation date
5/28/2008 1:27:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008022
IBM Index Class Name
PERMIT FILE
Doc Date
5/21/2008
Doc Name
New NOI to Conduct Prospecting
From
Homeland Uranium, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
temporary opening or gate would be permanently rewired and stretched to their <br />original tension. <br />• Removal or alteration of existing range improvements would be prohibited unless <br />prior approval from the BLM is obtained. <br />• Personnel would be instructed to minimize contact and avoid harassment of <br />livestock. <br />• Any facilities impacted by the proposed project would be repaired or replaced as <br />soon as practical before the end of the project. <br />Cultural Resources <br />• The third-party archeologist would conduct a Class III survey for cultural resources <br />of all areas to be disturbed by project activities including travel routes, drill sites, and <br />staging areas. All cultural sites identified in the Class III cultural resources field <br />survey would be flagged for avoidance. The archeologist would also be responsible <br />for assisting with protection, identification, and assessment of any cultural resources <br />discovered during the operations. <br />• If subsurface cultural resources were found during project operations, all work in the <br />immediate vicinity of the resource would cease and Homeland Uranium, Inc. would <br />notify the BLM immediately. Homeland Uranium, Inc. would implement those <br />measures requested by the BLM to protect the resource until it could be adequately <br />evaluated by a permitted archaeologist, if necessary. Further work at the <br />archaeological site would be discontinued. <br />• If human remains were encountered during project operations, all work in the vicinity <br />of the remains would cease and the remains would be protected from further <br />exposure or damage. Homeland Uranium, Inc. would notify the BLM immediately. <br />• All employees and their contractors would be informed before commencement of <br />operations that any disturbance to, defacement of, or removal of archaeological, <br />historical, or sacred material would not be permitted. Violation of the laws that <br />protect these resources would be treated as law enforcementtadministrative issues.
The URL can be used to link to this page
Your browser does not support the video tag.