Laserfiche WebLink
A BLM wildlife biologist would also review the project area and identity areas and <br />species of concern. This work would be completed on foot. Should a threatened, <br />endangered or candidate species be identified during the survey the area would be <br />flagged for potential avoidance, where necessary. Means of avoidance of any wildlife <br />resource would be determined, necessary project attributes would be relocated and/or <br />project timing restriction imposed. <br />PROPOSED ACTION <br />The proposed drilling points are positioned in an array over the project area and spaced <br />to gain maximum information while limiting the number of points, length of travel routes <br />and minimize surface disturbance (Figures 1 & 2). The points are concentrated where <br />reserves are more likely to be encountered or where sub-surface information is less <br />understood and where geologic anomalies may be present. Access roads are <br />configured to minimize surface disturbance, minimize drainage crossings and best <br />utilize the existing topography in the area. A list of hole names, claim serial numbers, <br />legal description and coordinate can be found in Table 1 below. <br />Table 1: Exploration Hold Locations <br /> <br />HOLE ID CLAIM <br />NUMBER <br />LEGAL DESCR. <br />UTM EAST <br />UTM NORTH <br />DEPTH <br /> <br />VX-08-001 <br />Vex 9 11 <br />SW/4 NE/4, Section 28, T46N, R17W, <br />4231914.153 <br />697054.86 <br />750' <br />VX-08-002 Vex 9 SW/4 NE/4, Section 28, T46N, R17W, 4231852.846 697054.986 750' <br />VX-08-003 Vex 9 / 10 SW/4 NE/4, Section 28, T46N, R17W, 4231792.62 697054.351 750' <br />VX-08-004 Vex 10 SW/4 NE/4, Section 28, T46N, R17W, 4231728.886 697054.124 750' <br />VX-08-005 Vex 10 SW14 NE/4, Section 28, T46N, R17W, 4231667.799 697054.833 750' <br />VX-08-006 Vex 9 SW/4 NE/4, Section 28, T46N, R17W, 4231885.477 697128.571 750' <br />VX-08-007 Vex 9 SW/4 NE/4, Section 28, T46N, R17W, 4231821.996 697128.525 750' <br />VX-08-008 Vex 10 SW/4 NE/4, Section 28, T46N, R17W, 4231762.636 697129.745 750' <br />VX-08-009 Vex 10 SW/4 NE/4, Section 28, T46N, R17W, 4231705.301 697131.943 750' <br />VX-08-010 Vex 10 SW/4 NE14, Section 28, T46N, R17W, 4231643.271 697131.596 750' <br />Note: UTM in NAD 83 / WGS 84 <br />The exploratory drilling project would involve: a) the construction of 5,202' (1 mile) of <br />new or upgraded travel route; b) the possible construction of up to ten exploration <br />drilling pits for drill fluids and cuttings (these pits would not be constructed unless water <br />is encountered during drilling; and c) the drilling of the uranium claims to determine the <br />quality and quantity of federal reserves within the project area and better understand the <br />underground geologic strata. Drilling of holes by truck-mounted drills would account for <br />the majority of work to be completed in the project area. <br />The following sections provide additional details regarding project activities. <br />Figure 3 illustrates the types of equipment to be used in the Vex Project. <br />Construction and Exploration Drilling <br />Where possible, the drilling rig would proceed from one drill point to the next with a <br />single pass per travel route. The travel routes would not be bladed or graded unless <br />necessary but multiple trips across the travel routes with the drilling rig and supply <br />transports would result in considerable disturbance to the travel routes. One travel <br />route is proposed that accesses the project area drill holes. The drilling rig would