My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-25_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2008-06-25_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:20 PM
Creation date
7/17/2008 2:17:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
6/25/2008
Doc Name
Cost Summary Form
From
DRMS
To
File
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br /> Subtotals :1 $0.00 $0.00 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest m ajor city or town within project area region : Monte Vista <br />Transportation Cycle Time : Non- Total one-way travel distance : 55.0 miles <br /> Roadable Roadable Average travel speed : 50.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.10 1.10 Total non-roadable mob/demob cost $1,251.29 <br />Return time (hours) = 1.10 1.10 two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $0.00 <br />Unloading time (hours) = 0.50 NA one round trip, no haul rig <br />Subtotals = 3.20 2.20 <br />JOB TIME AND COST Total job time : 6.40 hours <br /> Total job cost : $1,251
The URL can be used to link to this page
Your browser does not support the video tag.