My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-25_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2008-06-25_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:20 PM
Creation date
7/17/2008 2:17:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
6/25/2008
Doc Name
Cost Summary Form
From
DRMS
To
File
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $5.24 NA NA NA NA NA NA NA NA NA NA <br />'Economic life-Grader and ROPS : $5.24 NA NA $2.11 $3.48. $1.91 $3.07 NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.04 $0.35 $0.80 $0.51 NA NA NA NA <br />Annual usage : $7.90 $4.69 $7.03 NA NA NA NA NA NA NA NA <br />Double shifts : $5.93 $2.35 $3.51 NA NA NA NA NA NA NA NA <br />Triple shifts : $5.27 $1.56 $2.34 NA NA NA NA NA NA NA NA <br />Mechanic labor-Grader and ROPS : NA NA NA $1.24 NA $1.12 NA NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.02 NA $0.47 NA NA NA NA NA <br />Fuel/lube -Grader and ROPS : NA NA NA NA NA NA NA $12.78 $2.41 $1.75 $0.26 <br />Attachment no. 2: NA NA NA NA NA NA NA $0.00 $0.10 $0.00 $0.42 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires <br /> <br />G.E.C. <br />Grader, ROPS and Attachment no. 2: Motor Grader and ROPS : <br />Single shifts : $7.90 $4.69 $7.03 $1.24 $3.48 $1.12 $3.07 $12.78 $2.41 $1.75 $0.26 <br />Double shifts : $5.93 $2.35 $3.51 ttachment no. 2: <br />Triple shifts : $5.27 $1.56 $2.34 $0.02 $0.35 $0.47 $0.51 $0.00 $0.10 $0.00 $0.42 <br /> <br />HOURLY OPERATOR WAGES <br />Base <br />Rate <br />Fringe <br />Benefits . .: <br />F.I.C.A <br />7.65% . <br />Unempl. Wk.Comp. <br />6.20% 9.80% <br />Total <br />($/hr) <br /> <br />Shift Differential <br /> <br />Colorado labor zone : <br /> <br />2 <br />Grader - rough blade $16.39 $4.20 $1.25 $1.02 $1.61 $24.47 Day : $0.00 Two shift per day average : $0.15 <br />Grader - finish blade $16.39 $4.20 $1.25 $1.02 $1.61 $24.47 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic <br />HOURLY EQUIPMENT COST SUMMARY $16.74 $4.20 <br />Ownership $1.28 $1.04 $1.64 <br />Operating and Overhaul <br />Machine Attachments $24.90 Night: <br />Operator $0.45 <br />Total <br />Cost/hr ($) <br /> Single shifts : $19.62 $26.11 $1.87 $24.47 $72.07 <br /> Double shifts : $11.79 $26.11 $1.87 $24.62 $64.38 <br /> Triple shifts : $9.17 $26.11 $1.87 $24.72 $61.87 <br /> <br />EQUIPMENT PERFORMANCE DATA Horsepower Transmission Weight Length Width Height Fuel Min. turning i Ripper <br /> Description (FHP) type (UST) (ft) (ft) (IV type circle (ft) type <br />Motor grader : CAT 120H 125 NA 12.5 31.7 8.0 10.2 Diesel 47.34 NA <br />Attachment no. 1 : Moldboard (blade) NA NA NA NA 12.0 2.0 NA NA NA <br />Attachment no. 2 : Multi-shank ripper NA NA 0.7 NA 7.6 0.9 NA NA Parallelogram <br /> Total weight : 13.2 (UST) for ripper, maximum rippi ng depth <br /> Ground speeds (mph) at rated engine RPM <br /> Transmission Gear: 1st 2nd 3rd 4th 5th 6th 7th 8th <br /> forward 3.1 4.5 6.2 9.7 13.2 18.2 26.5 <br /> __reverse.: _ 1.8 _. _ 3.4. _ 4.9 .__77 .14.4 _ 20.9 NA- NA <br />
The URL can be used to link to this page
Your browser does not support the video tag.