Laserfiche WebLink
agcivii <br />VV, 06- <br />? v $M I ?? ? of TZ-Z Imo' ?0 <br />V , <br />Kye Abraham <br />From: Karmen King [kking@aquatox.us] JUN 2 J X008 <br />Sent: Friday, June 20, 2008 8:53 AM Durango c fc? Or`ico <br />To: 'Kye Abraham'; sglass@gaultgroup.com <br />Subject: Technical Revision fee status? Uninu and Safel <br />Kye - Hello therel I hope you made it back from the Wonder etc. in good order. Any evolvements on site?? <br />I just heard from JP that the driller (for the piezometer wells) may be available next week. This means our <br />Technical Revision needs to be in place, which also means DRMS needs to receive the TR fee (1,006.00) before <br />its considered complete. Gault Group can write a check ASAP if need be. Let me know as soon as possible. <br />I will be at the Wonder next week to obtain the underground samples and coordinate with Steve Belles to get <br />the final (hopefully) drawings for the pad water control features which I plan to submit as part of the DRMS <br />hearing. <br />Also FYI -I plan to take the week of June 30 -July 4 off. Let me know if you need anything beforehand. <br />Thanks much <br />K <br />`?G , A p0° <br />0 l <br />of <br />QoQO?? CO. <br />?m'OF <br />. <br />O P <br />2?"?• <br />g2?' <br />?i <br />O <br />I <br />2 <br />P <br />JU4 11 <br />o 2008 <br />Mining and Sa ep Lion <br />Y <br />6/20/2008