Laserfiche WebLink
-4- <br />12. Primarv future (Post-mining) land use (check one <br />_ Cropland(CR) _ Pasturcland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />- General Agriculture(GA) <br />Wildlife I labitat(WL) <br />?Industri al/Commerci al(I C) <br />Solid Waste Disposal(WD) <br />13. Primary present land use (cbeck one : <br />Cropland(CR) _ Pastureland(PL) <br />_ Rangeland(RL) _ Forestry(FR) <br />Residential(RS) Recreation(RC) <br />_ Developed Water Resources(WR) <br />_ General Agriculture(GA) <br />Wildlife Habitat(WL) <br />dustrial/Commercial (1 C ) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): This area is mined using loaders <br />and dozer to move material from the embankment to the processing plant. <br />15. On Site Processing: Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Processing Plant is moved to site until approximately 40,000 <br />tons is stockpiled. The stockpiles are removed as needed until it is time to crush again. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This amendment is to add 11.60 acres to the mine and make a minor <br />revison to the reclamation plan.