Laserfiche WebLink
6.4.4 Exhibit D - Mining Plan <br />This Technical Revision removes Cell 1 <br />revised mine plan begins with Cell 2A. <br />Sheets 1 and 2, to compliment this text. <br />from the permit area and therefore the <br />Please refer to Exhibit C-2 Mine Plan, <br />MINING METHODS <br />All of the mining operation will be "dry" mined. Dewatering trenches will be dug <br />around the perimeter of each mining cell and dewatered to Boulder Creek. <br />Stripping and mining will incorporate conventional aggregate mining methods, <br />including use of scrapers and dozers to strip overburden, backhoes and scrapers <br />to mine sand and gravel, and haul trucks to move material onsite. This operation <br />will mine and reclaim concurrently wherever and whenever possible. The permit <br />area has been divided into mining cells. The order of mining will generally follow <br />the numeric cell sequence. <br />EARTHMOVING <br />Cell 2A <br />Overburden stripping will begin in the northern area of Cell 2A and operations will <br />stockpile approximately 100,000 yd3 south of the excavation. Mining will proceed <br />by mining the backfill areas prior to mining the lake areas. (See Exhibit F - <br />Reclamation Plan Map.) This mining sequence allows for concurrent reclamation <br />and a single movement of overburden wherever possible. Mining will generally <br />proceed from north to south. See Exhibit C-2 Mine Plan, Sheet 2. <br />Cell 2B <br />Overburden from Cell 2B will be stripped and directly replaced in backfill areas of <br />Cell 2A. Mining will generally proceed from north to south. See Exhibit C-2 Mine <br />Plan, Sheet 2. <br />Cell 2C <br />Overburden from Cell 2C will be stripped from the western portion of the Cell <br />(long narrow strip of land) and directly replaced in the backfill areas of Cell 2A. <br />The overburden from the eastern portion of Cell 2C will then be stripped and <br />placed directly into the western portion (long narrow strip of land) backfill area. <br />Mining will generally proceed from north to south. See Exhibit C-2 Mine Plan, <br />Sheet 2. <br />Cell 3 <br />Prior to mining west of Boulder Creek, a low water crossing will be constructed to <br />allow haul trucks to access Cells 3, 5 and 6. The design for the low-water <br />crossing, utilizing large culverts, was approved by both the USACOE and the <br />CDRMS in 2004 as part of the original approval for this permit. A report titled <br />"Turnpike Mining Resource Low Water Crossing Design Report" should be <br />contained in the file for this permit. Prior to any mining activity below the water <br />table west of the creek, a hydraulic barrier trench will be constructed as shown