Laserfiche WebLink
SNOWCAP COAL COMPANY <br />PHASE I BOND RELEASE <br />SOUTH PORTAL/OVERLAND CONVEYOR <br />COST SUMMARY <br />DRMS DRMS TOTAL <br />TASK # TASK HRS DESCRIPTION JOB COST (DRMS Est) <br />001 172.85 Regrade Portal & Access Road to Highwall $106,059.00 <br />002 130.94 Regrade Material @ Lower Parking Area $80,643.00 <br />009 1.62 Regrade Water Tank Bench $996.00 <br />019 5.11 Haul TS & OB from Lwr Prk Area to RSRDA (See Note 1) $3,984.50 <br />035 3.47 Rip Roadside South Facilities Area $2,248.00 <br />036 8.54 Rip South Portal Area (See Note 2) $5,535.65 <br />050 2.42 Rip Light Use Road #1 $1,569.00 <br />051 7.04 Regrade Light Use Road #1 $4,318.00 <br />092 32.29 Excavate Portal Area for New Drainage $3,085.00 <br />093 7 Rip Rap Area for New Drainage $27,632.00 <br />120 80 Backfill Portal & Conveyor Entry $14,966.00 <br />131 11.4 Drill Seed Upland Seed Mix on Mine Site (Note 3) $9,258.78 <br />132 2.94 Broadcase Seed Upland Seed Mix on Steep Areas (Note 4) $3,951.66 <br />135 200 Demo & Remove Office/Shower (Note 5) $22,498.56 <br />135 Demo & Remove Shop $28,123.20 <br />135 Demo & Remove Warehouse $8,999.42 <br />135 Demo & Remove Substation behind Shop $83.33 <br />135 Demo & Remove Substation Pad $1,202.30 <br />135 Demo & Remove Substation Footing $799.55 <br />135 Demo & Remove Conveyor Tower $266.65 <br />135 Demo & Remove Storage Shed $133.32 <br />135 Demo & Remove Tank Pad $601.15 <br />135 Demo & Remove Access Road Guardrail $10,974.00 <br />135 Demo & Remove Cafeteria $9,843.12 <br />135 Demo & Remove Bldg behind Cafeteria $1,249.92 <br />135 Demo & Remove Lab $5,291.33 <br />135 Demo & Remove Guard Shack $132.93 <br />135 Demo & Remove Misc Building #2 $9,999.36 <br />135 Demo & Remove Retaining Wall $3,076.19 <br />135 Demo & Remove Power Lines to Roadside South $3,797.87 <br />135 Demo & Remove Septic Tank $403.25 <br />135 Septic Tank Sludge Removal $155.25 <br />135 Septic Tank Sludge Disposal $3,501.76 <br />1