My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-25_REVISION - M2006073
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006073
>
2008-06-25_REVISION - M2006073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:18 PM
Creation date
6/26/2008 8:25:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006073
IBM Index Class Name
REVISION
Doc Date
6/25/2008
Doc Name
TR Submittal
From
Lafarge North America
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARCE <br />NJA <br />ORTH AMERICA <br />AGGREGATES, CONCRETE <br />& ASPHALT <br />June 24, 2008 <br />Colorado Division of Reclamation, Mining and Safety <br />Attn: Tony Waldron <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Dear Mr. Waldron, <br />REM <br />Division of Reclamation, <br />Mining and Safety <br />JUN 2 5 2000 <br />Lafarge would like to request a Technical Revision to the 112c mining permit (File <br />Number M-2006-073,) issued by DRMS for Lafarge at the Sundance Sand and Gravel Pit <br />in El Paso County, CO on March 27, 2008,. At this time, Lafarge asks that the mining <br />operation on the property be broken into phases. As shown on the plot plan (attached) <br />there will be three phases of operation. Phase I will cover 194.3 acres of land in the <br />northern portion of the property. This accounts for approximately 45% of the operation. <br />The second phase will be Phase IIb and is located in the center portion of the subject <br />property and encompasses 194.7 acres of land. This also accounts for approximately 45% 11 of the operation. Phase IIa located in the southern portion of the property is the final <br />phase of the project. This area encompasses 39.5 acres of land and will be approximately <br />10% of the proposed operation <br />11 <br />Lafarge requests to split the required bond into three phases matching the above <br />described project phasing. Below you will find a chart breaking down each phase and <br />percentage of the bond for that phase. <br />Total Financial Warranty: $3;254,883 <br />Phase I: 45% - $1,464.697.351 <br />Phase Ilb: 45% - $1,464.697.35 <br />Phase IIa: 10% - $325,488.30 <br />Lafarge requests that each portion of the financial warranty be paid at the start of mining <br />for each phase of the operati n. The operation will begin with phase I and then move to <br />phase IIb and finally phase IIa. No other changes to the mining plan are requested at this <br />time. We thank you for you consideration in this matter and request your prompt <br />response to our request. If there are any questions, feel free to contact me at anytime. <br />Sincerely, <br />Sean Frisch, Land Planner, Office: 303-657-4336 <br />LAFARGE NORTH AMERICA INC. - Aggregate, Concrete, and Asphalt <br />10170 Church Ranch Way, Suite 200, Westminster, Colorado 80021 <br />Telephone: (303) 657-4000 Facsimile: (303) 657-4037
The URL can be used to link to this page
Your browser does not support the video tag.