Laserfiche WebLink
The proposed reclamation plan for the Valley Leach Facility (VLF) does not appear to be <br />protective of public health, property, and the environment. Specifically, the four (4) year <br />monitoring period following rinsing may not be sufficient to ensure long-term geochemical <br />stabilization of the heap prior to puncturing the protective liners, and we request an analysis <br />substantiating the sufficiency of the selected monitoring period.. Further, the proposed <br />standard of .'Z mg/l CNw,ao in the rinsate from meteoric water mobility testing on <br />representative sampling of the spent ore, or its .return. flows derived from the detoxificd ore, <br />or bath, does not appear adequate to protect public health, property, and the environment. <br />While this numeric standard coincides with Colorado groundwater standards, it is far in <br />excess Af area cirrfacc water quality standards. Given the location of the VLF in Arequa <br />Gulch and the subsurface mining structures and drainage tunnels directly underlying the <br />VLF, the final cyanide standard for the heap must ensure compliance with all surface water <br />standards. Further, the method for demonstrating compliance with any such standard should <br />be clarified and improved to ensure long-term protection of water quality. In particular, any <br />amended reclamation permit should ensure proper rinsing of the VLF, including <br />consideration for compacted layers and potential preferential flows through the heap. <br />Lastly, in under to Gubure successful rcclamation, examples of other heap clvsure plans <br />where rinsing and then puncturing the protective liners was successful should be required. <br />• VLF stability is not sufficiently demonstrated. Recent report., have shown some geologic <br />instability associated with the south end of the heap via a sloughing off of material and a <br />deterioration of the benches designed to stabilize that portion of the heap. The reclamation <br />plan should ensure geologic stability of the heap at all times during operation and during <br />reclamation and after closure. <br />The application indicates that geologic stability of the pit highwalls may be suspect, <br />particularly in the post-mining period. These stability issues should be fully resolved to <br />ensure long-term geologic stability prior to any pcrtnit approval. <br />The application does not sufficiently address Acid Mine Drainage issues. In particular, <br />while the application indicates a buffering capacity of the gculugic layer b0ow tlic sui'facx, <br />the application should demonstrate the long-term impacts associated with the exposure of <br />acid generating rock in the pits and mined lands, the waste rock storage areas, and the VLF. <br />The application should clearly demonstrate the total buffering capacity of the relevant local <br />geology, and provide a flan for ensuring that acid mine drainage is controlled and <br />effectively neutralized in perpetuity. Part of this demonstration should be a comprehensive <br />geological and water monitoring and characterization plan to ensure that all areas contained <br />in the mine pen-nit have been analyzed for acid mine drainage potential. While the current <br />outflows from the Carlton Tunnel do not exceed state standards for pH, any reclamation <br />pen-nit should require a comprehensive dernonstration that the Carlton Tunnel discharge will <br />not degrade or become acidic over time. To this end, the application should include a long- <br />tcrm monitoring plan at the Carlton Tunnel to ensure long-tenrri protection of Pour Mile <br />Creek and. the Arkansas River watershed. Lastly, the application should filly demonstrate <br />protection from any potential acid nline drainage assoninte:d with backfilled open pits. <br />• The application should ensure that the VLF design for any dams or berms constructed to <br />contain leachate or other chemicals ensure geologic stability and prevent sedimentation of <br />holding ponds. <br />• The application must identify all groundwater sources in the permit boundary, including any <br />and all perched aquifers, in order to ensure that the reclamation plan adequately protects <br />those existing groundwater sources.