Laserfiche WebLink
190002/oooz <br />05/12/2008 12:14 FAX 970+874+8366 COLORADO LIME CO. <br />a <br />UNITED STATES LIME & MINERALS, INC. <br />®®? COLORAI)o LIME CO. <br />1468 HIGHWAY 50 <br />DELTA, CO 81416 <br />(970) 874-8300 <br />May 12, 2008 <br />Department of Natural Resources -4C eX-? <br />0 Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Attention: Carl Mount / <br />RE: Monarch Quarry, Permit M-2000-098, Tech Revision 0,1- Adequacy Letter <br />Dear Carl: <br />This letter is in response to your phone call of May 8, 2008 concerning the adequacy of Colorado Lime's <br />application for Tech Revision #01. <br />In January 2008 Colorado Lime sent a letter requesting an extension for surveying and design work of the ponds <br />and roads due to the snow in the quarry. At that time, I anticipated being able to survey by mid April. <br />However, as of last Friday, the pond is still level full with a big snow drift. <br />With this in mind, Colorado Lime requests an extension on the decision date on this TR until June-15, 2008. <br />Please contact me at the number shown above or by email at tracygunn?m.com if you have any questions, <br />concerns or need additional information. <br />Respectfully, <br />a?? '40 - <br />Tracy Gunn, General Manager <br />Colorado Lime Company