Laserfiche WebLink
15. The text beginning page 2.05-28 is a new section (as the last section <br />completed with a reference page). There is no heading to begin this section of <br />text. Please add a heading to this first section. <br />16. Pages 2-2 through 2-31 under the heading "Rule 2 MISCELLANEOUS <br />REQUIREMENTS" contains information regarding the progression of the <br />reclamation bond at the Colowyo mine. This information is incomplete, as it <br />ends with a replacement corporate surety in 2002. Please include the <br />remaining reclamation bond information up to and including the changes <br />made with Technical Revision 66 and Permit Revision 02. <br />17. The reclamation bond information contained in pages 2-2 through 2-31, <br />referenced in question "16" above, is not in chronological order in the permit. <br />Please list the reclamation bond information in chronological order either <br />from oldest to newest or newest to oldest. <br />18. The first paragraph in section "4.05.9 - Permanent and Temporary <br />Impoundments", on page 4.05-6, gives a rule citation date of 21 March 2001. <br />The Rules have since been updated and this date citation is no longer correct. <br />Please update this paragraph with the correct date citation. <br />19. In the final paragraph on page 4.05-6, in section "4.05.9 - Permanent and <br />Temporary Impoundments", there is a statement that "The quarterly routine <br />inspections of these structures were conducted through the calendar year <br />2001." These structures have now been inspected through at least the first <br />quarter 2008. Please change this date citation. <br />20. Pages 4.05-10 and 4.05-11 give a summary of the changes to the Colowyo <br />Mine's hydrologic monitoring plan. This summary ends with changes in <br />1996. There have been many changes to the hydrologic monitoring plan since <br />1996. Please update this summary to include all the changes to the hydrologic <br />monitoring plan up to and including Technical Revision 70. <br />21. Pages 2.05-14 through 4.05-18 contain the Colowyo Mine's hydrologic <br />monitoring plan. This plan was revised with Technical Revision 70, approved <br />on 29 May 2008. Please update these pages with the new hydrologic <br />monitoring plan approved with TR-70. <br />22. Page 4.15-1 contains information on vegetation monitoring. This page also <br />contains information on the Colowyo Mine's weed control plan. This weed <br />control plan information is outdated and was replaced with information on <br />"old" page 4.15.1a. The information that was on "old" page 4.15-la has now <br />been eliminated from the permit. This weed control information is required <br />by Rule 4.15.1(5). Please add this information back to the permit.