Laserfiche WebLink
a <br />of <br />0 <br />LO <br />r <br />T <br />Fresh Water <br />O <br />Cripple Creek & Victor Gold Mining Company <br />AJ. V.- "GLOGOW Cp ..Ma <br />- - - - ► MLE Fresh Water <br />O <br />Pump <br />—► Enrich <br />ClIX <br />Flow Meter <br />- - ► MLE Enrichment <br />Vy <br />Valve <br />Barren <br />A9 <br />Wire Sampler <br />- - - - ► MLE Barren <br />—� Preg <br />- - - - ► MLE Preg <br />4,916 gpm <br />Phase 1 <br />A — — — — — — — — — — — - - - - - -I <br />Phase 5 <br />3 x 250 HP <br />New <br />I <br />1 <br />1 <br />_ 1 <br />4,916 gpm 4,916 gpm <br />Phase Phase ------------------- - - - - -J <br />3 x 250 HP 3 x 350 HP 3 x 250 HP 14,000 gpm <br />r -" <br />14,000 q <br />pm <br />J <br />l" <br />4,667 gpm 1 -- — <br />4,667 gpm 1 Barren <br />1 <br />i I Tank / \II <br />' 4x800 HP <br />4,667 gpm ` <br />Preg <br />Dist <br />Tank <br />14,000 gpm <br />—► / <br />MLE Ph 4 Preg Line Bedded and Buried MLE Ph 4 Line to Enrich <br />I <br />14,000 gpm --------- MLE Phase 5 Preg Line V 14,000 gpm <br />ADR; Five Carbon Adsorption Trains <br />------------------------------------ 9Pm----------------------------- - - - - -- <br />MLE Barren Line Bedded and Buried <br />14,750 gpm <br />C fA <br />cz m <br />-o c <br />N J <br />'D U <br />_a <br />lit 0_ <br />U ~ <br />C � <br />J d <br />Y E <br />a) <br />E <br />U C <br />.c 0 <br />Lc: E <br />w r <br />W 0 <br />J <br />W <br />w <br />J <br />Enrichment <br />Tank <br />1 <br />New 4 x 800 <br />HP <br />I <br />,} 14,750 gpm <br />i <br />/ y <br />_ 750 gpm <br />Fresh Water <br />750 gpm; ML <br />Fresh Water <br />Cenifica6on <br />O <br />Cripple Creek & Victor Gold Mining Company <br />AJ. V.- "GLOGOW Cp ..Ma <br />an./ <br />pm�y, <br />pe <br />BY <br />ClIX <br />APP <br />1 <br />4115M <br />1L5 <br />A9 <br />AB <br />Figure 7 -1: Enrichment Circuit <br />Cresson Mine -Mine Life Extension Permit M- 1980 -244 <br />Date: 0415 -2008 <br />Scale: NrS <br />ML Fg7 -14M9 <br />REV: <br />