Laserfiche WebLink
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN3 <br />Task description : Regrade Facilities area <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 30,000 <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $415.07 <br /> <br />............................................. <br />Swell <br />Loose <br />CCY factor : 1.125 volume : 33,750 LCY <br /> <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />6.00 % (neg) <br />6,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />Visibility: 1.00 (av <br />Job efficiency : 0083 (1 shit <br />Spoil pile : 0.80 (fnc <br />Push gradient : 1.14 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.87 (Cat <br />Blade type : 1.00 (S/S <br />Net correction : 0.44 <br />Adjusted unit production <br />Adjusted fleet production <br />402.89 <br />805.79 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time : 41.88 Hours <br />Unit cost : $0.515 /LCY Total job cost : $17,385