Laserfiche WebLink
DJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $5.11 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. No. 1 : $5.11 NA NA $1.47 $1.48 $2.82 $2.14 NA NA NA NA <br />-Attachment No. 2: $0.00 NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $9.41 $1.99 $1.79 NA NA NA NA NA NA NA NA <br />Double shifts : $7.06 $1.00 $0.89 NA NA NA NA NA NA NA NA <br />Triple shifts : $6.28 $0.66 $0.60 NA NA NA NA NA NA NA NA <br />Mech. Ibr.-Machine and Attach. No. 1: NA NA NA $0.93 NA $1.78 NA NA NA NA NA <br />-Attachment No. 2: 1 NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />FueVlube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $5.47 $0.91 $0.95 $0.00 <br />Attachment No. 2 : NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and Attachments No. 1 and No. 2: Basic Machine and Attachment No. 1 <br />Single shifts : $9.41 $1.99 $1.79 $0.93 $1.48 $1.78 $2.14 $5.47 $0.91 $0.95 $0.00 <br />Double shifts : $7.06 $1.00 $0.89 ttachment: <br />Triple shifts : $6.28 $0.66 $0.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 12.60% ($Ihr) Shift Differential Colorado labor zone : 2 <br />Driller - Rotary, Chum or Cable T. $16.07 $4.41 $1.23 $1.00 $2.02 $24.73 Day : $0.00 Two shift per day average : $0.15 <br />N $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Swing : $0.30 Three shift per day average : $0.25 <br />Mechani $16.74 $4.20 $1.28 $1.04 $2.11 $25.37 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $13.20 $13.66 $0.00 $24.73 $51.59 <br />Double shifts : $8.95 $13.66 $0.00 $24.88 $47.49 <br />Triple shifts : $7.54 $13.66 $0.00 $24.98 $46.18 <br /> <br />PMENT PERFORMANCE DATA <br />ption Type Struck <br />Capacity (cy) Heaped <br />Capacity (cy) Weight <br />(UST) Weight <br />(MT) Length <br />(ft) <br />'RIC 3.0 in. - 500 ft. capy. Trailer mtd. short coring rig NA NA 5.00 NA NA <br />water pump station, 225 psi Clear water pump service NA NA 0.25 NA NA <br /> NA NA NA 0.00 NA NA <br />speeds (mph): 1st (or max.) 2nd 3rd 4th 5th 6th <br />Forward : NA NA NA NA NA NA <br />Reverse : NA NA NA NA NA NA <br />!r bucket type or Compaction Maximum vertical Max. horiz. Excavator bucket capacity (cy) <br />)actor drum type width/pass (ft.) reach height (ft.) reach (ft) small medium large <br /> NA NA NA NA NA NA <br /> <br /> w w ........ ........ . <br />u <br />Width <br />(ft) Height <br />(ft) Min. turning <br />circle (ft) Horsepower <br />(fhp) Fuel <br />type <br />NA NA NA 20.00 Diesel <br />NA NA NA 24.00 Diesel <br />NA NA NA NA NA <br />7th 8th minimum dump Max. dump <br />NA NA clearance (ft.) height (ft.) <br />NA NA NA NA <br />Lift capacity (lbs) Max.dig/rip Shank No. <br />optimal max. reach depth (ft.) spacing shanks <br />NA NA NA NA NA