Laserfiche WebLink
CIRCES Cost Estimatina Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Task #: 047 State : Colorado Permit/job #: C1992-081 <br />Date : 0513012008 County :Routt Abbreviation :none <br />User : JHB Site : Hayden Gulch Load Out Filename : C081-047 <br />Permit or other job action : Rn3 <br />Task description : Mob/demob equipment for site maint. & pond cleaning <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Cost Breakdown <br />........................ <br />..................... <br />NfNN_RnAnARI F F[3IIIPMFNT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D3G XL - 3P 9.17 $11.29 $88.67 5 $499.80 $443.35 $0.00 <br />-Cat 325C L 31.07 $38.60 $117.55 1 $156.15 $117.55 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $655.95 $560.90 $0.00 <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45