Laserfiche WebLink
CIRCES Cost EstlmatinaSottw <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name : Division Of Reclamation, Mining And Salety <br />Task #: 037 State : Colorado Permitflob# : C1992-081 <br />Date : 13-May-2008 County : Routt Abbreviation : none <br />User : JHB Site : Hg Load Out Filename : C81 -037 <br />Permitting action : RN3 <br />Task description : Demolish structures (TR6 approvals) <br />UNIT COSTS Last unit cost update : May, 2007 Location adjustment: 92.32% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-Truck Dump Hopper 6600 Demo.ldisplappr. dump - to 5 mi. 6,600.00 CF $1.0437 $6,888.49 <br />-concrete floor 18'th. x 495 sq. ft. Demo.ldisp. exa pit, 4'th.- 50 ft. 495.00 SF $1.1173 $553.08 <br />-foundation walls 30' 7963 Demo./disp. exs. pit, 1.5x2'- 50 ft. 7,963.00 LF $10.0559 $80,075.33 <br /> <br />-Reclaim Tunnel 36" belt vibrator 12 Demo./disp. exs. pit, 1.5x3- 50 R. 12.00 LF $15.0839 $181.01 <br /> <br />-Dump Hopper Conveyor Tunnel 10' dia. x 115 ft. Ret. wall, steel - 12.1' D x 20'H 115.00 LF $50.0000 $5,750.00 <br /> <br />-dump Hopper Conveyor 147 Lin. Ft. Conveyor, elevated - 8'W x 10'H 147.00 LF $45.3900 $6,672.33 <br /> <br />-Crusher building 20160 cubic feet Demo./disp.lappr dump - to 5 mi. 20,160.00 CF $1.0437 $21,041.20 <br />crusher floor 12'th. 672 sq. ft. Demo./disp. exs. pit, 12'th.-200 ft. 672.00 SF $3.3890 $2,277.39 <br /> <br />-Powerhouse (2) 2240 cubic feet Demo./disp./appr dump - to 5 mi. 2,240.00 CF $1.0437 $2,337.91 <br />-powerhouse floors 224 sq. ft. Demo./disp. exs. pit, B'th.- 200 ft. 224.00 SF $2.2593 $506.09 <br /> <br />-Dust Suppression Pressure Tank Building 1344 Cubic Feet Demo.ldisp.lappr dump - to 5 mi. 1,344.00 CF $1.0437 $1,402.75 <br />-floor of Dust suppression building 192 sq, ft. X8" th. Demo./disp. exs. pit, 8' th.- 200 ft. 192.00 SF $2.2593 $433.79 <br /> <br />-Dust suppression System building 672 cubic feet Demo./disp./appr. dump - to 5 mi. 672.00 CF $1.0437 $701.37 <br />-floor of dust suppression system building 96 Demo./disp. exs. pit, 8'th.- 200 ft. 96.00 SF $2.2593 $216.89 <br /> <br />-Water Storage Tank 6872 Demo./disp./appr. dump - to 5 mi. 6,872.00 CF $1.0437 $7,172.38 <br /> <br />-Railroad track (loop & Spur) 17424 Lin. Feet Railroad track - Ties and track 17,424.00 LF $7.5400 $131,376.96 <br />ballast included in Task 1 <br />-Loadout building 63700 cu. ft. Demo.ldisp.lappr. dump - to 5 mi. 63,700.00 CF $1.0437 $66,484.33 <br />-footings of Loadout building 130 fin. ft. Demo.ldisp. exs. pit, 2x3'- 200 ft. 130.00 LF $20.3338 $2,643.39 <br /> <br />-Loadout Belt (60' W) 290 Lin. Ft. Conveyor, overland - 5'W x W H 290.00 LF $15.1400 $4,39a 60 <br /> <br />-Rail Car positioner & hopper 82560 Demo.ldisp.lappr. dump - to 5 mi. 82,560.00 CF $1.0437 $86,168.71 <br />-positioner & hyper walls 12'th. X 584 sq. ft. Demo./disp. exs. pit, 12" th.-200 It. 584.00 SF $3.3890 $1,979.16 <br /> <br /> <br />-Rail Car Dump Hopper Reclaim Tunnel- Belt 60' W x 120ft. L Conveyor, overland - 5'W x W H 120.00 LF $15.1400 $1,816.80 <br />-floor 12'th. X3360s.f Demo.ldisp. exs. pit, 12'th.-10Kft. 3,360.00 SF $3.4143 $11,471.91 <br />-24' foundation walls 24" th. X 5248 s. f Demo./disp. exs, pit, 12" th.-fOK ft. 10, 496.00 SF $3.7538 $39,399.79 <br /> <br />-Dump Hopper Belt conveyor Tunnel 16'dia. 106 Lin. Ft remove converyor tunnel 106.00 LF $240.9000 $25,535.40 <br /> <br />-belt-601w. 60"W X 146'1 Conveyor, overland - 5'W x 6'H 146.00 LF $15.1400 $2, 210.44 <br /> <br /> <br />-Radial stacker pad 12'th. X 3625 s.f. Demo.ldisp. exspit, 4'th.- 50 ft. 3,625.00 J $1.1173 $4,050.30 <br />-Radial stacker boom 1401. f. Conveyor, elevated - 5' W x 6' H 140.00 $37.8300 $5,296.20 <br /> <br />-Foglet system control building 1920 s.f Demo.ldisp.lappr. dump - to 5 mi. 1,920.00 CF $1.0437 $2,003.92 <br /> <br />-2 offloe trailers 19500 cf + 7200 cf Demo.ldisp.lexcav. pit - 10K' haul 26,700+00 CF $0.2132 $5,692+06 <br /> <br /> <br />-Culverts 12' culverts Pipe, CMP - 12 in. diem. 166.00 LF $2.1737 $360.83 <br />-18' CuNerts 469 If Ape, CMP - 18 in. diem. 469.00 LF $2.3533 $1,103.71 <br />-24' cuvrerts 9401 f. Pipe, CMP - 24 in. diam. 940.00 LF $3.1548 $Z965.52 <br />-36' Culverts 50 If Poe, CMP - 36 in. diam. 50.00 LF $4.8633 $243.17 <br />-42' Culverts 152 If Pipe, CMP - 48 in. diam. 152.00 LF $6.1925 $941.27 <br />-60, Culverts 2901.f Pipe, CMP- 60 in. diam. 290.00 LF $13.0542 $3,785.71 <br />-96'CuhreRs 165 If Pipe, CMP- 96 in. diam. 165.00 LF $30.8135 $5,084.23 <br />-102* Culverts 585 If Ape, CMP-96 in. diam. 585.00 LF $30.8135 $18,025.91 <br />-108' Culverts 3 to If <br />-108' Culverts 3301.f Pipe, CMP - 108 in. diam. 330.00 LF $42.9048 $14,158.58 <br />JOB C03T subtotal (unadjusted): $573,399 Total Cost (adjusted for locauon): 55Zli,3t/Z