Laserfiche WebLink
SHRUBS AND TREES (seed) : <br />MULCHING and MISCELLANEOUS <br />Materials item no. 1 <br />item no. 2 <br />item no. 3: <br />item no. 4: <br />DESCRIPTION (data source) UNITS/ACRE UNIT COST / UNIT COST/ACRE <br />Straw, delivered (DMG survey data) 2.00 ton $102.28 $204.56 <br /> <br /> <br /> <br />TOTAL MULCH MATERIALS COST / ACRE : $204.56 <br />Application - method no. 1 : Power mulcher (MEANS 32 91 13.16 0700) $65.78 <br />method no. 2: Crimping, with tractor (DMG survey data) $57.07 <br />method no. 3: <br />TOTAL MULCH APPLICATION COST/ ACRE : $122.85 <br />NURSERY STOCK PLANTIN G TYPE and SIZE MATERIAL PLANTING COST / FERT. TOTAL TOTAL <br />COMMON NAME NO. /ACRE (planting cost data source) COST/PLANT COST/PLANT PELLET COST/PLANT COST/ACRE <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />I V I AL KUKJCKT AI VI.Al U.l 1 I M+N C: oV.W <br />JOB COST No. of acres : 2.40 Cost I acre : $571.57 INITIAL JOB COST : $1,371.77 <br />Estimated failure rate (percent) : 20.00% Cost / acre': $428.91 RESEEDING JOB COST : $205.88 <br />Selected replanting work items : S M TOTAL JOB COST : $1,578 <br />FORBS . sheet 2 of 2 <br />TOTAL SEEDS / SO. FT.: 54.4 ' TOTAL POUNDS PLS / ACRE : 7.85 ' TOTAL SEED MIX COST I ACRE : $24.73 <br />Seed aoolication - method : Drill seeding (DMG survey data) TOTAL SEED APPLICATION COST / ACRE : $76.78