Laserfiche WebLink
TORT DEWATERING WELL NO.2 <br />RECLAMATION COST ESTIMATE (MR08-228) <br />Facilities Demolition and Removal <br />Borehole Reclamation <br />Plugging and sealing materials - (1,360' x 12" dia., 40cy cement @ $70/cy) 2,800 <br />Plugging and sealing labor - (8 hrs @ $250/hr) 2,000 <br />Subtotal $4,800 <br />Well-Head and Pipeline Reclamation <br />Remove 8-foot diameter CMP cap - (1 @ $1,000 ea) 1,000 <br />Cut-off and cap pipelines below grade - (2 @ $200 ea) 400 <br />Subtotal $1,400 <br />Transformer Pad and Powerline Reclamation <br />Remove 5'x 10'x 0.5' Concrete Pad - ($4.85/ft2) 1,210 <br />Remove Powerpoles - 6 poles x $500/pole 3.000 <br />Subtotal $4,210 <br />Site Reclamation (Pad Extension) <br />Backfilling, compaction, and grading - (0.2 acres @ $1,200/ac) 240 <br />Topsoil replacement - (0.2 acres @ $1,000/ac) 200 <br />Revegetation - (0.2 acres @ $800/acre) 160 <br />Subtotal $600 <br />Site Reclamation (Pipeline Disturbance) - Reclamation occurs at the time the pipeline is installed <br />Subtotal - All Direct Costs <br />Indirect and Administrative Costs ((a, 8%) <br />Total Estimated Reclamation Cost <br />$11,010 <br />880 <br />$11,890 <br />Notes: Costs from Means Site Work and Landscape Cost Data and recent bond calculations <br />• <br />MR08-228 06/02/08