My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:43:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 3)
From
Climx Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 ti <br /> <br /> 4 - 4" 4' 4 I - 4" <br /> 1 <br /> <br /> <br />.. 14'-0" <br />' <br />J' <br />'•[ <br />?n <br /> ii <br />Y <br />• <br />11 i <br />4 <br /> ipirr <br />NAn <br />G11111 <br />iui <br />6" . <br />1 <br />1 I <br />l <br />n <br /> ROOF SECONDARY PLAN FOR CONSTRUCTION <br />I <br />OimensioD Key <br />lJ VP Ref: Shape Name Weir Bea Bldg <br /> <br />1. UNLESS NOTED, USE 112X 1112 A"32S SNUG TIGHTENED BOLTS FOR <br />THE VP ENGINEER'S SEAL APPLIES <br />ONLY TO THE WORN PRODUCT OF THIS DRAWING INCLUDING THE INFORMATION HEREON <br />REMNNS THE PROPERTY OFVP6UApNCi <br />NG <br />ILD <br />VP Buildings, Inc. <br /> <br />ROOF SECONDARY PLAN <br />PURLWLAP,PURUN TO FRAME, FLANGE BRACETO FRAME,AND FLAN GE <br />BRACETO PURUN CONNECTIONS, VP AND DESIGN AND PERFORMANCE I <br />FTIS PROVIDED SGLELYFGR ERECTING THE BU <br />DESCRIBEOWTHEAPPLICAOIE PURCHASE ORDER AND <br />REPAODIICEDOHIUSEDFOR <br />1uLLN0fBETHUPD <br />1200 Players Club Circle Memphis TN 16125 <br />Q <br />AND PURLIN BRACING ARE AN INTEGRAL PART OF THE <br />FLANGE <br />i1MND RCQUIREDIENTS SPECIFIED BY 0P. <br />DOES <br />GI <br />E <br />'S SE , <br />WITHOUT <br />5 <br />PAroRwa TEN <br />TmvOSE <br />ZYOKALI nE\, -'E m o?cRemv Leleum0uilding System s <br />, <br />, <br />TEM AND SHOULD BE PROPERLY INSTALLED PRIOR THE VP EN <br />NE <br />R <br />AL <br />GS <br />DIN <br />C <br />APPAOVAOF VPBULWIGS. <br />M00600572-01 <br />ROOF STRUCTURAL SYS <br />TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF NOT APPLY TO THE PERFORMANCE <br />OR DESIGN OF ANY OTHER PRODUCT <br /> <br />ERECTOR IS SOLELY <br />ANDIOR <br />CONTRACTOR <br />GE14ERAL <br />THE I-EICIlm3a Molybdenum Co. nre <br />ROOF BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. E <br />IGNE <br />OT VP <br />F <br />OR COMPONENT WORKMANSNI <br />FOR <br />ACCURATE <br />RESPONSIBLE <br />GOOD QUALITY ErcAml <br />l <br />d <br />g <br />E 91148006 <br /> EX <br />S <br />O <br />CEPT TO AN <br />D <br />EXCEPT TO AHY DESIGN M1 PER- INERECINGTHISBUMINGNCONFORMANCE WITNTHIS <br /> <br />? <br /> <br />? <br /> <br /># ora <br />o <br />Frisco, Co <br />DINGS <br />P <br />SUIL <br />wan200 <br /> FORMANCE REQUIREMENTS DRAWNGG,DETAILS REFERENCED IN THIS DRAWING <br />GBLEVPERECTIONGUDEG <br />P <br />Weir Boa Buildin <br />Clim ? <br />- Si <br /> SPECIFIED BY VP. W <br />ALLA <br />AND IFDUSTRYSTABOMDS PERTAINING TO PROPER g <br />ax 2 <br />NbE <br /> <br />. ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY wilDFeam ?, <br />6 <br />5 <br />B <br />. BRACING. .. NTS <br />???-.?? fAGWff vnnennn?n,nN .. .
The URL can be used to link to this page
Your browser does not support the video tag.