Laserfiche WebLink
112"X114" BUSHING 2" SCH 40 <br />320 <br /> (TYP 4) SLOWER PIPING <br /> 112" CHECK (FIELD ROUTE) <br /> ----- - - - - - - - - - - - - - - - - - - - - - - -VALVET PIPE BRACKET <br />I MICHIGAN 351 (OR EQIV.) MANWAY DOOR <br /> <br />r ---- <br />-- I I Wt BOLTED PIPE STRAP <br />1/2" SS AIR (TYP 4) <br />LEVEL I CHAMBER 121 <br />METER <br /> <br />I I <br />I <br />I PIPING <br /> <br />I <br />STEM WALLS <br /> I PRESSURE <br />I RELIEF 316 1" SS BALLVALVE (TYP. 2) <br /> <br />1" SS UNION (TYP 2) <br /> I I VALVE <br />READOUT I I I ? 1" X 1/2" BUSHING <br /> (TYP 3) <br /> <br />I I AIR <br />, I <br />COMPRESSOR <br /> 112" UNION <br />LEVEII. (TYP 2) <br />CONTROLLER PUMP HEADER PRESSURE REGULATOR <br />CHECK VALVE <br />I <br />ELECTRICALI I <br />O <br />BILT BLOWER <br />POWER <br /> <br />--- <br />-- <br /> <br />-- / <br />\ <br />? aSS W/ 5 HP <br /> <br />1 6" DRIP <br />$ <br /> <br />a MOTOR, 4 SCFM @4 PSIG <br />I LEG <br />FE?fT <br />318 STILLING J <br />WELL <br />1/4" SOLENOID 300 PSI <br />VALVE (TYP2) PRESSURE <br />GAUGE <br />TO AIR <br />ATMOSHPERE CHAMBER <br />1 AIR CHAMBER PIPING <br />SCHEMATIC(N.TS.) <br />18" HEADER <br />112" CAP J <br />112" BALL VALVE <br />NOTE: USE ALL 316 SS PIPING <br />PIPE <br />CLAMP <br />1 114" X 8" <br />4"X3"X5116" CNCBOLTW/ <br />TUBE.2'-10Y{ ' (TYP 4) WASHER & NUT <br />2'-7" <br />2'-11%" <br />(TYP 3) <br />PUMP MOUNT G <br />SECTION (N.T.S.) <br />W <br />Z <br />w <br />It <br />W <br />W <br />PUMP <br />SUPPORT <br />BEAM <br />PUMP MOUNT r <br />SECTION (N.T.S.) M-01 <br />1" SS CLOSE NIPPLE <br />(TYP. 2) <br />1" 45° SS ELBOW <br />1" SS TEE <br />1" SS PIPE CLAMP <br />(FIELD LOCATE) <br />NOTE: SHIM PUMPS AS REO'D TO ALIGN VERTICALLY. <br />ORA4bNG rID. RERErSNE TNis dreemlg tone, with as parent eledrom media file N0. MBE <br /> is the property of W W WNeebr 6 Associates. utess eDa6 <br />' <br /> oth-se..Wod orw-riedadby nft-agreenant RECORD Z © s <br />u°e <br /> with thedierllisted ntheWebAocr.nunmmedonur DRAWING N nrsoT <br /> express rnadon that a shed not be reproduced. coped. <br />DATE: 11/2/07 7 <br />W Q <br /> nor used Marry dhmpupose then MMuch are it, Q <br /> sp ed6capy Mn shed wtthaA the prior written consent of <br /> sad W W Wheeler A Associates. Q <br />ra er am m <br />Saw pGl R.bwtlbrWweea BNd+q <br />eCb aMM luul krcemeur0on <br />pcN SMM Reewtl De-s <br />2 BUBBLER SYSTEM PIPING <br />GENERAL ARRANGEMENT (N.T.S.) <br />_________ _------ <br />--------- d <br />1" SS PIPE CLAMP <br />(FIELD LOCATE) <br />BUBBLER SYSTEM PIPING <br />DETAIL (N.T.S.) <br />1" SS PIPE <br />(FIELD LOCATE) <br />1" 45" SS ELBOW <br />RbsaRxs Fee Retard Record By Deb W. W. WUW W aea Ww1pLpe Y <br />D.s,n bee Climax Sludge Management Project -? Water Resomces&Qirwws <br />z?.x p„wR sAC me Cfimat Mine <br />CLIENT: Climax Molybdenum Co. -Climax. CO <br />r_- Chdt mW as <br />#3 Dam Seepwater Pump System wKbNwww Drawlmo No <br />Piping 105123.01 <br />- D3PS-M-03 <br />Miscellaneous Details As Noted <br />L <br />PUMP HEAD --\ <br />PUMP BASE <br />PUMP SOLE <br />PLATE <br />PRESSURE GAUGE <br />REF. DETAIL <br />DWG M-02 <br />2'-7- <br />2'-102-'- <br />I I ELDLOC TE PUMP <br />SUPPORT <br />BEAM <br />SUMP WALL 4 <br />36" HDPE PIP