My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:43:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 3)
From
Climx Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 PIPE SUPPORT sza <br />GENERAL ARRANGEMENT <br />D Y5 1 2 3 <br />Sale in Feet <br />2 PIPE SUPPORT s27 <br />GENENL1RRANGEME- <br />0 14 1 2 3 <br />Sale in Feet <br />114" NPT <br />SS NIPPLE <br />(TYP 2) <br />1/4" NPT FULL PORT <br />SS BALL VALVE <br />317 (TYP 2) <br />18" 0 HEADER <br />DRILL AND TAP <br />Y4" NPT ON CL <br />(TYP 2) <br />1a2 (TYP 2) <br />REF. DETAIL THIS DWG. <br /> peaWlx: NO. AEfERE1<E Thu drawing together wxh AS parent ekdm made Me <br /> <br />W is the properly orW W Wheel.6 A.-et-, u Wen <br />r <br />j ahenme eecepteaasuperseded sy»+erenegre-if RECORD Z <br />W wdhtheam+ rWdinthe &r.No flshumsrreannthe DRAWING 4 <br />n <br />W express oonddion that x shell not be prod-d. spied <br /> <br />7 <br />J <br />LL <br />w <br />nerusedW erryNharpugrote Nan /awdedlAd DATE: 11/2/0 w <br /> spedfRaNy finished wdhgrtthe prior written consent of <br /> Sad W. W Wheeler 6 ASSOtietes. <br />4 ANGLE ial <br />N.T.S. DETAIL MAKE 4 EACH FROM 112" PLATE <br />N T 12 <br />ANGLE 1a2 3 <br />5 N.T.S. DETAIL MAKE b EACH FROM 1/4" PLATE <br />ASTM A36 STEEL <br />DRILL HOLES TO MATCH <br />12-INCH 300 LB. ANSI FLANGE <br />2" <br />8" SCH 40 <br />3" 316 SS PIPE <br />0 0 0 <br />0 0 <br />O 0 <br />INSTALL <br />0 0 V-81/2" 1'-0" TOWARDS <br />HEADER <br />0 0 <br />0 0 <br />0 0 0 <br />114 <br />ROUND OFF <br />CORNER 2" 316 SS <br />PLATE <br />MAKE 11 EACH <br />6 AIR CHAMBER ORIFICE so3 <br />DETAIL <br />0 4 a 16 24 <br />Scale in Indies <br />pg1E 1l<?F BY CIm.6Y RFMARAe Fit. Record nu <br />A(196 OLM 51111 Aekea41e1GMtla Btldg _ <br />6rA08 pal SW IniK k, GrooaronIl'.]4- <br />112gg Of:M 5101 AeroN Onwgr <br />W. W. Wheeler WW Rta , Itxe <br />Climax Sludge Management Project Water Resources 6lglneers <br />Cfmax Mine ey'°°0.f°°1e nlie <br />CLIENT: Climax Molybdenum Co. -Climax, CO <br />#3 Dam Seepwater Pump System w <br />Drawing No <br />Pipe Clamps, Orifice Plate t05123.Ot <br />w, D3PS-S-15 <br />Plan, Section, and Details As Noted A <br />HIVE <br />l4" 0 CONCRETE <br />ANCHOR BOLT <br />(TYP 2) <br />1 <br />MAKE 2 EA ASSEMBLY <br />I ' -16 1 <br />(FIELD VERIFY) <br />TYP <br />1 1 y <br />REF. DETAIL THIS DWG. <br />18" 0 GRINNELL FIG. 212 <br />8"0 PIPE PIPE CLAMP <br />TYP <br />314" 0 NC 3/8 <br />BOLT (TYP 2) <br />PUMP SUPPORT <br />/ BEAM <br />9 <br />'I <br />16 <br />(FIELD VERIFY) <br />MAKE 3 EACH ASSEMBLY <br />718" 0 HOLE <br />1Z. <br />3 <br />ASTM A36 STEEL <br />718" 0 HOLE <br />113. <br />4 <br />L <br />1" <br />NOTE: TAPS MUST BE EXACTLY IN LINE. <br />3 COLLINS TUBE TAPS <br />DETAIL (N.T.S.)
The URL can be used to link to this page
Your browser does not support the video tag.