My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:24:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 2)
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30„ 150 LB. <br />30" 150 LB. SS BLIND 205 NATIVE SOIL BACKFILL. 12G LOCATING <br />COMPACT TO MIN. 95% MAX. <br />SLIP-ON FLANGE STD. PROCTOR DENSITY. WIRE <br />GROUND <br />TYPICAL CLEANOUT g37 123 <br />24" FLANGE FLANGE (FUTURE CONNECTION DPE SURFACE DTAIL E POSITION INDICATOR <br />ADAPTER AND (TYP 2) FOR MILL WATER LINE) P PE REF. DWG <br />G05 VALVE EXTENSION <br />BACKING RING INSIDE 5" Cl SOIL PIPE <br />200 PSI <br />221 8" SCH 40 PIPE (TYP3) <br />24" HOPE <br />7 3 <br />30" FLANGE ADAPTER CONCRETE FILLED IIF <br />GROUND <br />SURFACE <br />, <br />" AND BACKING RING <br />200 PSI ;W3 <br />3 <br />fi 412 <br /> <br /> FLOW <br />, <br />, 6 IN. <br />/,i va/%•? <br />2"HDPE >7/y?q2.• <br />in <br />- - - 6 <br />0 <br />- - -- . <br />WATER LINE 702 <br /> GROUND 1 Yi" GRANNULAR BEDDING MATERIAL. <br />24" 150 L.B SURFACE 3'4- + CONSOLIDATE USING VIBRATING FIELD LOCATE <br />316 SS 3-0 G' MINPLATE COMPACTOR <br />. <br />WELD NECK ?-- 6'-0" TO DAYLIGHT <br />ON wi <br />FLANGE Et ?=E ,?EE= <br /> <br />rn <br />" <br />" <br />Er 4" LIME LINE FIBER OPTIC LINE <br />TO DAYLIGHT <br /> <br />30 <br />X 24 <br />? <br />STD <br />WT <br /> <br />?? <br />30" HDPE 3, 0" <br />" <br />(TYP 2) 6" MIN V-0"MIN. <br />. <br />' <br />" <br /> <br />- <br />. <br />. <br />316 SS <br />ha <br />30 <br />316SS SDR9 5 <br />-6 <br />MIN TO DAYLIGHT <br /> <br />? + <br />M 0 PI <br />SCH 10 PIPE <br />. <br />REDUCER A (TYP) GRANULAR <br /> BEDDING MATERIAL <br /> CONCRETE ENCASEMENT " <br /> 6" ALL SIDES 24 <br />FLANGE ADAPTER <br /> <br />NOTE: 1) ALL 316 SS CONSTRUCTION. <br />POSITION PIPES WITH MIN. W CLEARANCE AND BACKING RING <br />(TYP 2) <br />2) BOLT HOLES TO STRADDLE CENTERLINE. FOR 2" AND 4" PIPES AND MIN. 6" CLEARANCE 4" BURIED SERVICE <br /> FOR 30" PIPE. PLACE BEDDING 18" BURIED VALVE (TYP 2) <br /> TO ACHIEVE NO VOIDS. SERVICE VALVE <br />311 <br />n 24" TO 30" HDPE TRANSITION 275 2 BOLLARD 309 <br /> GENERAL ARRANGEMENT <br />" <br /> 30 <br />HDPE TRENCH SECTION <br />3 ELEVATION <br />24" AND 4" DRAIN DETAIL <br />0 4 8 12 0 4 8 12 S <br />Scale in Feet Scale in Feet <br /> D 4 8 12 4" HOPE LIME LINE <br /> Scale in Feel 0 4 8 12 (TYP 2) <br /> Scale in Feel <br /> NOTE: THE 4" AND 2" LINES MAY BE <br /> INSTALLED ON EITHER SIDE OF THE <br /> SEEPWATER PIPE. IT MAY BE NECESSARY <br /> TO CROSS THE 4" LINES UNDER THE <br /> SEEPWATER PIPE AT SOME POINT <br /> ALONG THE PIPELINE. <br /> NATIVE SOIL BACKFILL. <br /> COMPACT TO MIN. 95% MAX. 12G LOCATING <br /> STD. PROCTOR DENSITY. GROUND <br />W RE r <br />4" TEE 263 <br /> SURFACE <br /> 24 HOPE <br /> / <br />P <br />PE <br /> <br />276 4" HDPE FLANGE 239 <br />ADAPTER AND <br /> EXISTING CANAL r <br />r ri r /' / / E F <br /> <br />" <br />" BACKING RING <br />2 <br /> SERVICE ROAD /i <br />r 24 <br />X18 <br />SS TEE <br />EXISTING EAST / y, E (REF. DWG. M-02) TO DAYLIGHT <br />INTERCEPTER CANAL <br />(CLEAN WATER) PLACE SPOILS AWAY FROM <br />VODTH VARIES INTERCEPTER CANAL <br /> <br /> <br />TA 1+00 - _ <br /> <br />TO DAYLIGHT <br /> <br />- - ? <br />- - - - 2" HDPE 6 0 AYUGHT <br />_ WATER LINE <br /> 1 ?" GRANNULAR BEDDING MATERIAL. <br /> 7 '_7 <br />CONSOLIDATE USING VIBRATING <br /> T-0 <br />6^ PLATE COMPACTOR <br />I <br /> <br /> SLOPE VARIES FIBER OPTIC LINE <br />NOTE: " <br />CONTRACTOR SHALL TAKE MEASURES NECESSARY 4 <br />LIME LINE FIELD <br />TO PREVENT THE FLOW OF SEDIMENT FROM THE (TYP 2) 6" MIN. V-0" MIN. <br />51 A.. LOCATE <br />4"CLEANOUT <br />TRENCH EXCAVATION INTO THE CANAL. MIN. (TYP) 272 <br /> PIPELINE TRENCH 1/i' GRANULAR <br /> BEDDING MATERIAL POSITION PIPES WITH MIN. X CLEARANCE 24" HDPE <br /> FOR 2" AND 4" PIPES AND MIN. 6" CLEARANCE <br />30" HDPE TRENCH FOR 24" PIPE. PLACE BEDDING I <br />TYP. sECnON ua1G INTERCEPT ER TO ACHIEVE NO VOIDS. <br /> 24" AND 4" DRAIN DETAIL <br />° s4 8 cale in Feet 1z 4 24" HDPE TRENCH SECTION "AN <br /> ELEVATION <br />D 4 8 12 <br /> 0 4 B 12 Scale in Feel <br /> Scale in Feel <br /> owx+np xa ssmpzeP This orawmgtogether with is parent ~- mo&a rft mm MeoEa. -s' REMMaa paz aewm R.-,d By Da ,e- W. Wb@Ww W, 6, <br />w <br />i <br /> wMepapenyofW.W.MTeekr&Assoaales,udess <br />Q <br />"e <br />w <br />sMM <br />DCM <br />a"w.a»IC.aeeMmaq <br />"a"'+'"'a" <br />D+?sn Sludge Management Project o <br />1 <br />waterR sma <br />w <br />U <br />z <br />omen"i»emptedorsuperseded eyw,rtrenoWromrent <br />RECORD to <br />Z 6'D.Bfi OCY sum W-d Fo,GmeurAn x"w' DMwn I CGlnar Male <br /> <br />CLIENT: Climax Molybdenum Co. -Climax <br />CO <br />w wanmeaea aardmrnermeaaa nrsnn.aMawm. DRAWING O <br />o Q -41 Otw eMM R_ Pm g, w[ C wa <br />#3 Dam S <br />wat <br />r P <br />S <br />t , <br /> <br />w <br />express COfldlfionlhefit slalnot be AptlJJILBC,MpB1 <br />> <br />Q eep <br />e <br />ump <br />ys <br />em =n?B <br />DTaWInoNo <br />U. <br />w <br />nauumMarryahenppoemannwnhaa <br />OATE11l1107 <br />w? <br />Q <br />Bxek <br />Pipeline 1051.23.0 1 <br /> w.Bwam , - D3PS-C-04 <br /> speahanyNmiehedmmart U. pia wstlen --N of d <br />il <br />S <br />i I A <br /> sad w W xmawr6Assoaaw. ect <br />ons an <br />Deta <br />s MoME 3
The URL can be used to link to this page
Your browser does not support the video tag.