My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:24:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 2)
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 DAM FIELD PROCESS AREA 3 DAM SCADA CONTROL PANEL SDP SCADA CONTROL PANEL SDP SCADA COMPUTER <br /> <br /> 3 DAM <br /> BUILDING <br /> SP TEMPERATURE <br /> 5606 TAH <br /> T1132 I/o MODULE <br />DIGITAL INPUTS <br />755 <br /> 3 DAM D - - <br />3 <br />- <br />COM - - <br />F13 <br />- 1A - TB1-F3 (120 VAC) P9 TAI. <br /> 3 <br />D BUILDING 755 <br />755 <br />I <br />14 <br />s - - - <br />- - - - - - - - 14 D10- 14 <br />755 <br /> TEMPERATURE NO <br />- <br />- - - <br /> <br />' F 15 ---Z--- 15 DIO-15 <br /> D <br />J I <br /> CoM <br />TSL <br />L <br />? <br />TSL <br /> ?75555 <br />---------- SP <br /> - - <br />NO - - - 5209 <br /> CONTROLLER <br /> COM3 <br /> $P RS 232 <br /> 5209 <br /> CONTROLLER <br /> P7 P7 <br /> RJ45 RJ45 <br />I <br /> ru ? <br /> <br /> w w <br /> El E1 <br /> ETHERNET FIBER <br /> ETHERNET/FIBER <br /> SWITCH SWITCH <br /> RJ45 RJ45 <br /> FIBER OPTIC <br /> TX SC SC RX <br /> FIBER OPTIC <br /> RX SC SC TX <br />I <br />i <br /> 1 ADDED ALARM VALUES O.C. 03 !47. <br /> 0 ISSUED FOR CONSTRUCTION Mc 1 08131106 <br /> NO REVISIONS BY DATE <br />TEMPERATURE : 3 DAM PUMP STATION BUILDING TEMPERATURE NOTES: © CLIMAX MOLYBDENUM <br />SET POINT :NONE D PROVIDED BY 3 DAM PUMP STATION CONTRACTOR ASubsidiary of Phelps Dodge Corporation <br />SLUDGE MANAGEMENT PROJECT <br />ALARM HIGH HIGH :NONE 3 DAM PUMP STATION <br />HARM HIGH V CONTROL LOOP 155 <br />R 05018-D-07 PIPING & INSTRUMENTATION DIAGRAM IYAMWINCORPORATED <br />ALA DRAWING Z. DRAWING TITLE <br />ALARM LOW TAW :NONE REFERENCE DRAWINGS CAD-0 McCash 6 0 31507 <br />1 A30 <br /> ALL OF THE <br />AS PREPARED BY LYNTEK CK K. 07/31/06 . <br />E , <br />THIS DRAWING W <br />INFORMATION CONTAINED THEREIN IS THE PROPERTY OF <br /> <br />t J. HARVEY DRAWING N0. <br /> <br />I REV. <br />INTERLOCK : NON LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT CLIENT -- <br />05 <br /> <br />RIZATION OF LYNTEK <br />SCAIE <br />(D NONE 018-I-96 1 <br />CONTROLS : NONE . <br />THE PROPER WRITTEN AUTHO <br />
The URL can be used to link to this page
Your browser does not support the video tag.