My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:24:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 2)
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 DAM FIELD PROCESS AREA 3 DAM SCADA CONTROL PANEL SDP SCADA CONTROL PANEL SDP SCADA COMPUTER <br /> 3 DAM MIX BOX <br /> C4 <br /> TB4 F -TB3-10 (+24 VDC) 5506 <br /> I/O MODULE <br /> A <br />A B P4 <br /> 1 <br />C <br />_ <br />° --- <br />- <br />G <br />-I a IAIOB-6 <br /> 740 3 - L <br />p <br />-? <br />TB4.12 <br />9SH <br />L_I <br /> TO NEXT <br />TERMINAL BLOCK SP <br />5209 <br />PIC PAH <br /> CONTROLLER 740 <br />PCV P10 <br />740 <br /> <br />+ <br />M <br /> <br />-------- - - - - - - - <br />T86 r------ <br />---A - B - --- <br />- -%X 1-Y,° GND <br /> <br />1 AOOA-1 <br /> <br /> <br />P <br />- - - - - - - - - - - - - - - - <br />If T66.2 5209 <br /> CONTROLLER <br /> <br /> <br />SP COM3 <br />RS-232 <br />RJ45 <br />(!?D <br />Qt 5209 <br />CONTROLLER <br /> P7 P7 <br /> RJ45 RJ45 <br /> i z <br /> w w <br /> <br />3 DAM LIME 3 DAM LIME <br />SLURRY TANK CIRCULATION <br />T-551 PUMP #1 _ E1 E1 <br /> P-551 ETHERNET/FIBER ETHERNET/FIBER <br /> SWITCH SWITCH <br /> RJ45 RJ45 <br /> 3 DAM LIME TX SC FIBER OPTIC SC RX <br /> CIRCULATION <br /> PUMP #2 <br />RX <br />SC FIBER OPTIC <br />SC TX <br /> P-552 <br /> 1 AS BUILTS O.C. 12410/07 <br /> 0 ISSUED FOR CONSTRUCTION Mc 08/31/06 <br /> NO REVISIONS BY DATE <br />PRESSURE : 3 DAM LIME DELIVERY CIRCUIT <br />© CLIMAX MOLYBDENUM <br />SET POINT : 15psi ASubsidiary of Phelps Dodge Corporation <br />NONE <br />GH SLUDGE MANAGEMENT PROJECT <br />ALARM HIGH HI <br />: 3 DAM L STATION <br />: 2Q <br />ALARM HIGH (PAH CONTROL LOOP <br />ALARM LOW : NONE 05018-D-07 PIPING & INSTRUMENTATION DIAGRAM /?/????/ <br /> DRAWING NO. DRAWING TITLE I.lll?/?.fl+ INCORPORATED <br />ALARM LOW LOW : NONE REFERENCE DRAWINGS CAD- G.McCash 06 12 06 <br /> ALL OF THE <br />THIS DRAWING WAS PREPARED BY LYNTEK clro. K. LEWIS 06/12/06 120607.1300 <br />INTERLOCK :NONE , <br />INFORMATION CONTAINED THEREIN IS THE PROPERTY OF P.M. J. HARVEY DRAWING NO. EV. <br />740 MODULATES TO MAINTAI N THE SELECTED PRESSURE LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT WENT f <br />. <br />CONTROLS : PCV- <br />THE PROPER WRITTEN AUTHORIZATION OF LYNTEK. <br />SCALE: <br />(D)NONE 05018-1-93 1
The URL can be used to link to this page
Your browser does not support the video tag.