My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:24:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 2)
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 DAM FIELD PROCESS AREA 3 DAM SCADA CONTROL PANEL SDP SCADA CONTROL PANEL SDP SCADA COMPUTER <br />C1 <br />5505 <br />T85 RTD MODULE <br />TE <br />- <br />718A <br />r <br />'D <br />--- _ <br /> _ <br />? - ------- <br />---- <br />7188 <br /> <br />D <br />- - - - - - - - - - - - - <br />---- ? <br />--- <br />-------- <br />TE <br />180 --------- <br />I <br />? <br />D <br />I <br />I <br />r- <br />- ----- <br />118D <br />I --------- -- -- <br />E ?- ? <br />- l - <br />U T85.9 <br />c D_ <br />° TOS•10 <br />gn " " n,F <br />li T05.11 <br />En??F <br />9314 i TBS•12 <br />J- 4 <br />5 A11-0 <br />Z a <br />1 A11-1 <br />to <br />_ P4 <br />2 <br />L 3 AI1-2 <br />4 0 TIC TAH <br />a I 718A <br />1 A11-3 O TIC TAH <br />° I 7188 <br />C2 O TIC TAH <br />5505 718C <br />TB5 RID MODULE <br />P3 TIC TAH <br /> <br />_ -_-_-_-_-_-_-_- <br /> <br />------- <br />718E ------------ - <br />? <br /> ---- <br />718F --------- <br />TE <br />- - - - <br />719A <br />> <br /> <br />- - - - - - - - - - - - <br /> <br />- <br /> <br />- ----- <br />- - - - - <br />? <br />----- <br />r 7,98 . <br />------ ? <br />--- <br />" ?F <br />N TOS•13 <br />F <br />U T05.14 <br />- cn n0 _ <br />?F <br />li TBS•1S <br />-E^ <br />=05.16 <br />s 4 O 718D <br /> s <br />° AI2-0 <br />O TIC <br />718E TAH <br /> <br />S <br />r ° <br />1 <br />AI2-1 <br />0 <br />? <br />TAH <br /> 10 71 BF <br /> <br />- P4 O TIC <br /> <br />119A TAH <br /> 2 <br />1 3 AI2-2 O TIC TAH <br /> i 719B <br /> ° <br />7 <br />AI2-3 O <br />I NIC <br />720 NAH <br />I p SP <br /> T82 5209 <br />3 DIGITAL INPUTS <br /> -------- 34 --0VDC P3 SP <br />N51{ <br />r - <br />- - - - - -1 El DIOA-1 5209 <br />720 NC <br />- - - - - - - - - - - - - <br />- - - - - - - - 35 - <br />CONTROLLER <br />I <br />COM3 <br /> RS 232 <br />120 VAC SP RJ45 <br /> 5209 <br />i CONTROLLER <br /> <br />SOURCE WATER P7 <br />I TO SDP <br />RJ45 <br /> <br />RJ45 <br />(t CHAN <br />I <br />VSD CHAMBER <br />I <br /> <br />'> <br />tz <br />M M <br /> <br />< z <br />W <br />D 3 D , <br /> E1 <br />., ETHERNET/FIBER ETHERNET/FlBER <br />_ SWITCH SWITCH <br />3 DAM <br />PUMP <br />z <br />RJ45 <br />RJ45 <br />: <br />SUMP <br /> RK FIBER OPTIC TX <br />VERTICAL TURBINE VERTICAL TURBINE FU'U'^.E "ER-Ti.-AL <br />FIBER <br />OPTIC <br />PUMP PUMP TX SC SC RX <br />' 'z= 1 AS BUILTS O.C. 1 12/10407 <br />P-141 P-142 0 ISSUED FOR CONSTRUCTION Mc 1 08/31106 <br /> <br /> NO REVISIONS BY GATE <br />TEMP AND VIBRATION : 3 DAM VERTICAL TURBINE PUMP (P142) - TOR WINDING TEMP (OTY 6), NOTES: ©CLIMAX MOLYBDENUM <br />BEARING TEMP (QTY 2), AND VBRATION SWITCH. D PROVIDED BY 3 DAM PUMP STATION CONTRACTOR <br />ASubsidiary ofPhelps Dodge Ceryoaation <br />SET POINT : <br />NONE SLUDGE MANAGEMENT PROJECT <br />t <br />ALARM HIGH DING TAHH: 338 • F. BEARING TAHH: 217 F. 3 DAM PUMP STATION <br />ALARM HIGH TAH: 318' F. BEARING TAH: 197 F. CONTROL LOOP 718.720 <br /> 05018-D-07 PIPING & INSTRUMENTATION DIAGRAM INCORPORATED <br />MIMI" <br />ALARM LOW : NONE 01 DRAWING N0. DRAWING TITLE <br /> REFERENCE DRAWINGS CAD G.McCosh 08 01 O6 <br />120607 <br />ALARM LOW LOW : NONE ALL OF THE <br />PREPARED BY LYNTEK CKD. K. LEWIS 08 01 06 . I I I <br />VERTICAL TURBINE PUMP ON H H MOT WINDING TEMP , <br />THIS DRAWING WAS <br />INFORMATION CONTAINED THEREIN IS THE PROPERTY OF P.M. J. HARVEY DRAWING NO. REV. <br />INTERLOCK :TURN OFF <br />OR HIGH VIBRATION SWDCH. <br />HIGH BEARING TEMP LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT CLIENT <br />0 <br />1 <br />, RIZATION OF LYNTEK scAlE (D)NONE 5018-1-91 <br /> , <br />THE PROPER WRITTEN AUTHO : <br />CONTROLS :NONE
The URL can be used to link to this page
Your browser does not support the video tag.