My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:24:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 2)
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SDP FIELD PROCESS AREA SDP SCADA CONTROL PANEL SDP SCADA COMPUTER <br />LIME SLURRY SUPPLY LINES <br /> (+24 VDC) <br /> FROM PREVIOUS <br /> TERMINAL BLOCK SP <br /> 5606 <br /> TB4 I/O BOARD <br /> <br />PIT 1 - - - ----- ? - A B <br /> <br />-{? C <br />D ----- P4 <br /> <br />--1 3 IAIOB-3 <br /> 450 L L <br />J <br /> 3 <br />- - - - - - - II <br />TB4.9 _ <br /> TO NEXT <br /> TERMINAL BLOCK <br />PCV C4 <br />450 <br />TB5 5302 <br />ANALOG OUTPUTS <br />+ - ---------- --------- ---- -A -A$--OB - <br />D + <br />M <br />- - <br />---------- --------- <br />--- C n <br />- - <br />II T85.11 7- - - 2 A04-2 <br />- O <br /> SELECT <br /> T87 PUMP 9 1 PIC PAH <br />OR #2 <br /> <br />L_--- <br />---------- --------- <br />---- <br />- eF80 2Ae ---- <br />--TB1-CB4(120VAC) 450 <br /> <br /> SP <br /> 5209 <br /> CONTROLLER <br /> <br />O COM3 <br />RS 232 <br /> RJ45 <br />SDP LIME SDP LIME D <br />SLURRY TANK CIRCULATION <br />T-531 PUMP #1 <br /> P-531 <br /> Illo- <br />O <br /> SDP LIME <br /> CIRCULATION <br /> PUMP #2 <br /> P-532 <br /> 2 AS BUILT KLL12 10 07 <br /> 1 REVISED PCV-450 & PIC-450 O.C. 104/13/07 <br /> 0 ISSUED FOR CONSTRUCTION Mc 08 31 06 <br />PRESSURE : SDP LIME DELIVERY CIRCUIT NO REVISIONS <br />BY <br />DATE <br /> CLIMAX MOLYBDENUM <br /> <br />SET POINT 60psi <br />: © <br /> A Subsidiary of Phelps Dodge Corporation <br />ALARM HIGH HIGH : NONE SLUDGE MANAGEMENT PROJECT <br />ALARM HIGH (PAH) : 70psi SLUDGE DENSIFICATION PLANT <br /> CONTROL LOOP 450 <br />ALARM LOW :NONE <br /> 05018-D-04 PIPING & INSTRUMENTATION DIAGRAM /yA17???P // <br />ALARM LOW LOW : NONE ® DRAWING NO. DRAWING TITLE L INCORPORg7ED <br /> REFERENCE DRAWINGS -0 0! /06 <br />06 <br />INTERLOCK : P-531 AND P-532 TURN OFF AT PAH OR lAl <br />THIS DRAWING WAS PREPARED BY LYNTEK <br />ALL OF THE CCXD K. LEWIS 0, <br />O6 120507.0950 <br /> R , <br />INFORMATION CONTAINED THEREIN IS THE PROPERTY OF P•M• J. HARVEY DRAWING NO. i <br />E. <br />CONTROLS : PCV-450 MODULATES TO MAINTAIN THE SELECTED PRESSU <br />LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT <br />agar n <br /> <br />THE PROPER WRITTEN AUTHORIZATION OF LYNTEK. <br />SCALE <br />(D) NONE 05018-I-64 2
The URL can be used to link to this page
Your browser does not support the video tag.